Completion of the Proton Power Upgrade project at the Spallation Neutron Source

The Proton Power Upgrade (PPU) project at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) has completed the installation and testing of all project scope required to meet threshold key performance parameters (KPPs), supported beam commissioning in June 2024, and transitioned to operations in July 2024. Increasing the beam energy from 1.0 to 1.3 GeV required the installation of seven additional cryomodules in the SNS Linac along with supporting RF systems. The accumulator ring injection and extraction regions were upgraded, a 2 MW mercury target was developed, and ancillary target systems were upgraded to support high-flow gas injection, mercury off-gas treatment, and ortho-para fraction control in the cryogenic moderator hydrogen loop. Three of four threshold KPPs have been demonstrated, and the project is planning for its final review in early 2025. Beam power on the first target station (FTS) will be ramped up to 2 MW over the next two years. Completion of the PPU project supports increased scientific capability at the FTS and will support operation of the second target station (STS) upon its completion. Lessons learned will be documented and a project closeout report will be written prior to the final closeout of the project.

Authors

Institutions

Publication Details

Journal
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)
Published
2024-10-25
DOI
https://doi.org/10.18429/jacow-linac2024-thpb045
Citations
1
Primary Topic
Particle accelerators and beam dynamics
Type
article
Field-Weighted Citation Impact
1.30

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Completion of the Proton Power Upgrade project at the Spallation Neutron Source

M. Howell, M. Champion, G. D. Johns, J. Galambos et al.
1 citations
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)
Particle accelerators and beam dynamics
1.30
article

Completion of the Proton Power Upgrade project at the Spallation Neutron Source

M. Howell, M. Champion, G. D. Johns, J. Galambos, Karen White, Nicholas Evans, Sang-Ho Kim
article en
1 citations

Abstract

The Proton Power Upgrade (PPU) project at the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) has completed the installation and testing of all project scope required to meet threshold key performance parameters (KPPs), supported beam commissioning in June 2024, and transitioned to operations in July 2024. Increasing the beam energy from 1.0 to 1.3 GeV required the installation of seven additional cryomodules in the SNS Linac along with supporting RF systems. The accumulator ring injection and extraction regions were upgraded, a 2 MW mercury target was developed, and ancillary target systems were upgraded to support high-flow gas injection, mercury off-gas treatment, and ortho-para fraction control in the cryogenic moderator hydrogen loop. Three of four threshold KPPs have been demonstrated, and the project is planning for its final review in early 2025. Beam power on the first target station (FTS) will be ramped up to 2 MW over the next two years. Completion of the PPU project supports increased scientific capability at the FTS and will support operation of the second target station (STS) upon its completion. Lessons learned will be documented and a project closeout report will be written prior to the final closeout of the project.

OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)
Oak Ridge National Laboratory (US)
Oak Ridge National Laboratory
Affordable and clean energy
Openalex Percentile: Top 12%
Particle accelerators and beam dynamics
1.30
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Completion of the Proton Power Upgrade project at the Spallation Neutron Source — M. Howell, M. Champion, et al. · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) (2024) | TGRS Research Map | TGRS