Optimized scheduling for demand response in a distributed CHP-VPP park with thermal and cold energy storage devices

A virtual power plant has the capability to aggregate decentralized energy resources, including generation, storage, and demand, thereby enhancing the flexibility of the power system and providing support for the integration of new energy sources and the development of innovative power systems. This paper focuses on a distributed industrial and commercial park with thermal and cold energy storage facilities, constructing a microgrid structure for the Virtual Power Plant (VPP) park. Unit models for energy production, conversion, and storage devices within the park are established. The objective function of minimizing operational costs for the park is considered, taking into account constraints related to energy balance within the park, grid interactions, and device operations. An optimization scheduling model for the distributed combined cooling, heating, and power (CCHP) VPP park, incorporating thermal and cold energy storage, is developed. The inclusion of energy conversion equipment such as gas-fired boilers and electric refrigeration, along with energy storage facilities like thermal and cold storage, effectively enhances the flexibility of energy supply scheduling within the park. This allows for the decoupling of heating, cooling, and electricity scheduling and enables the time-shifting of energy consumption, leading to a noticeable increase in the potential and profitability of the distributed VPP park's participation in power demand response. Finally, a case study is conducted to validate the proposed model, using a real VPP park in Shanghai, China, participating in peak shaving demand response. The results indicate that the distributed CCHP VPP park, equipped with thermal and cold energy storage facilities, can provide peak shaving and load-filling capabilities to the power system. Furthermore, the effective integration of energy storage enhances the overall flexibility of the VPP park, and appropriate demand response compensation mechanisms effectively incentivize its participation in the demand response market.

Authors

Institutions

Publication Details

Published
2024-10-16
DOI
https://doi.org/10.1117/12.3033490
Primary Topic
Smart Grid Energy Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimized scheduling for demand response in a distributed CHP-VPP park with thermal and cold energy storage devices

Zhongfang Li, Tiantian Chen, Fengqing Du
Smart Grid Energy Management
article

Optimized scheduling for demand response in a distributed CHP-VPP park with thermal and cold energy storage devices

Zhongfang Li, Tiantian Chen, Fengqing Du
article en

Abstract

A virtual power plant has the capability to aggregate decentralized energy resources, including generation, storage, and demand, thereby enhancing the flexibility of the power system and providing support for the integration of new energy sources and the development of innovative power systems. This paper focuses on a distributed industrial and commercial park with thermal and cold energy storage facilities, constructing a microgrid structure for the Virtual Power Plant (VPP) park. Unit models for energy production, conversion, and storage devices within the park are established. The objective function of minimizing operational costs for the park is considered, taking into account constraints related to energy balance within the park, grid interactions, and device operations. An optimization scheduling model for the distributed combined cooling, heating, and power (CCHP) VPP park, incorporating thermal and cold energy storage, is developed. The inclusion of energy conversion equipment such as gas-fired boilers and electric refrigeration, along with energy storage facilities like thermal and cold storage, effectively enhances the flexibility of energy supply scheduling within the park. This allows for the decoupling of heating, cooling, and electricity scheduling and enables the time-shifting of energy consumption, leading to a noticeable increase in the potential and profitability of the distributed VPP park's participation in power demand response. Finally, a case study is conducted to validate the proposed model, using a real VPP park in Shanghai, China, participating in peak shaving demand response. The results indicate that the distributed CCHP VPP park, equipped with thermal and cold energy storage facilities, can provide peak shaving and load-filling capabilities to the power system. Furthermore, the effective integration of energy storage enhances the overall flexibility of the VPP park, and appropriate demand response compensation mechanisms effectively incentivize its participation in the demand response market.

Shanghai University of Electric Power (CN), Shanghai Electric (China) (CN)
Affordable and clean energy
Openalex Percentile: Top 84%
Smart Grid Energy Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.