Simulating the Operation Modes of a Wind Farm with a Three-Phase Permanent-Magnet Synchronous Generator

The article discusses the general concept of simulating a wind farm with the transition from a single model to a planned powerful wind farm with parallel operation of wind turbines. The results obtained from analyzing the simulation of the operation modes of the 2.5 MW L100 wind turbine equipped with a three-phase synchronous permanent magnet generator and a set of equipment manufactured in Russia are presented. The analysis was carried out taking into account variations in the velocity of wind acting on the wind wheel blades controlled by adjusting the blade angle and is based on the wind farm simulation model developed in the Matlab/Simulink software package. The algorithm of "tracking the maximum power point" by power converters of the "back-to-back" type was used, which showed the possibility of efficient control of wind turbines by controlling the generator speed. The analysis of the wind turbine operation modes has confirmed high dynamic characteristics of the vector control method, due to which the generator can quickly respond to changes in the wind velocity. The necessity to install a filter at the converter output on the electrical network side to ensure the required electric power output quality is substantiated.

Authors

Publication Details

Journal
Elektrichestvo
Published
2024-08-16
DOI
https://doi.org/10.24160/0013-5380-2024-8-60-69
Primary Topic
Electric Power Systems and Control
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Simulating the Operation Modes of a Wind Farm with a Three-Phase Permanent-Magnet Synchronous Generator

A. Tadzhibaev, Vladimir FROLOV, Venanciyu Liambesi SATCHILEMBE
28 links
Elektrichestvo
Electric Power Systems and Control
article

Simulating the Operation Modes of a Wind Farm with a Three-Phase Permanent-Magnet Synchronous Generator

A. Tadzhibaev, Vladimir FROLOV, Venanciyu Liambesi SATCHILEMBE
article en

Abstract

The article discusses the general concept of simulating a wind farm with the transition from a single model to a planned powerful wind farm with parallel operation of wind turbines. The results obtained from analyzing the simulation of the operation modes of the 2.5 MW L100 wind turbine equipped with a three-phase synchronous permanent magnet generator and a set of equipment manufactured in Russia are presented. The analysis was carried out taking into account variations in the velocity of wind acting on the wind wheel blades controlled by adjusting the blade angle and is based on the wind farm simulation model developed in the Matlab/Simulink software package. The algorithm of "tracking the maximum power point" by power converters of the "back-to-back" type was used, which showed the possibility of efficient control of wind turbines by controlling the generator speed. The analysis of the wind turbine operation modes has confirmed high dynamic characteristics of the vector control method, due to which the generator can quickly respond to changes in the wind velocity. The necessity to install a filter at the converter output on the electrical network side to ensure the required electric power output quality is substantiated.

Elektrichestvo(8)
Affordable and clean energy
Openalex Percentile: Top 84%
Electric Power Systems and Control
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.