RETAINING WALL PLANNING IN WASTE MANAGEMENT

This study aims to analyze the performance and productivity of heavy equipment as well as the volume of waste produced in a waste disposal area (TPSA) located in Kuningan Regency. The research was carried out at the Ciniru TPSA located in Jalaksana District, Kuningang Regency, with the aim of finding out the data on the volumes of waste, transport trucks, and excavator heavy equipment. The results show that the amount of existing waste in the area reaches 630 m3 with an average amount of irritation of 71 times per day. In addition, the production of heavy machinery for garbage trucks, excavators, and bulldozers reaches 128.07 m3/hour, which is a working time of 8 hours and operational costs of Rp 244,957/hour, respectively. The findings of this study offer valuable information on the effectiveness of retaining walls in mitigating environmental impact, protecting agricultural areas, and improving waste handling practices. Moreover, investigating methods to extend landfill lifespan through improved spatial planning and capacity forecasting will be crucial, especially for regions facing waste overflow challenges in the near future.

Authors

Institutions

Publication Details

Journal
International Journal of Social Service and Research
Published
2024-10-14
DOI
https://doi.org/10.46799/ijssr.v4i10.987
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

RETAINING WALL PLANNING IN WASTE MANAGEMENT

Arief Firmanto, Ace p., Ranapurwala Mustafa F, Inggy Rendiansyah
International Journal of Social Service and Research
BIM and Construction Integration
article

RETAINING WALL PLANNING IN WASTE MANAGEMENT

Arief Firmanto, Ace p., Ranapurwala Mustafa F, Inggy Rendiansyah
article en

Abstract

This study aims to analyze the performance and productivity of heavy equipment as well as the volume of waste produced in a waste disposal area (TPSA) located in Kuningan Regency. The research was carried out at the Ciniru TPSA located in Jalaksana District, Kuningang Regency, with the aim of finding out the data on the volumes of waste, transport trucks, and excavator heavy equipment. The results show that the amount of existing waste in the area reaches 630 m3 with an average amount of irritation of 71 times per day. In addition, the production of heavy machinery for garbage trucks, excavators, and bulldozers reaches 128.07 m3/hour, which is a working time of 8 hours and operational costs of Rp 244,957/hour, respectively. The findings of this study offer valuable information on the effectiveness of retaining walls in mitigating environmental impact, protecting agricultural areas, and improving waste handling practices. Moreover, investigating methods to extend landfill lifespan through improved spatial planning and capacity forecasting will be crucial, especially for regions facing waste overflow challenges in the near future.

International Journal of Social Service and ResearchVol. 4(10)
Universitas Swadaya Gunung Jati (ID)
Responsible consumption and production
Openalex Percentile: Top 82%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.