Cost Minimization with Project Crashing: Comparison of the Traditional Solution and Genetic Algorithm Approach

Existence of delays and cost overruns frequently puts the project viability in jeopardy. The integrated nature of these threats brings forward project scheduling as the primary determinant of project management success. The quality of project scheduling depends highly on the way resources are assigned to activities. In the project management literature, the efficiency of resource allocation is examined closely by the phenomenon called project crashing. This study introduces traditional and genetic algorithm approaches for the project crashing events and explains their steps in achieving the most efficient resource allocation. Within this context, the project crashing event is visualized, the insights of alternative approaches are described, and their implementations are illustrated with a case study. Besides, the procedures required for adopting the genetic algorithm approach to a typical problem are expressed. The case study illustration reveals the advantages and disadvantages of the genetic algorithm approach over the traditional approach. It is observed that the genetic algorithm approach can reach the solution in a single phase while the traditional approach requires multiple phases. On the other hand, the genetic algorithm approach may not reach the optimum solution unless the toolbox options are appropriately selected. This study presents the contribution of operational research to the project management body of knowledge by demonstrating the applicability and efficiency of genetic algorithm in the project crashing events. Researchers and industry practitioners may benefit from the proposed approach by following the indicated procedures to incorporate genetic algorithm into optimization issues in different fields.

Authors

Institutions

Publication Details

Journal
Sakarya University Journal of Science
Published
2024-10-14
DOI
https://doi.org/10.16984/saufenbilder.1467829
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Cost Minimization with Project Crashing: Comparison of the Traditional Solution and Genetic Algorithm Approach

Semih Çağlayan, Sadık Yiğit
Sakarya University Journal of Science
Resource-Constrained Project Scheduling
article

Cost Minimization with Project Crashing: Comparison of the Traditional Solution and Genetic Algorithm Approach

Semih Çağlayan, Sadık Yiğit
article en

Abstract

Existence of delays and cost overruns frequently puts the project viability in jeopardy. The integrated nature of these threats brings forward project scheduling as the primary determinant of project management success. The quality of project scheduling depends highly on the way resources are assigned to activities. In the project management literature, the efficiency of resource allocation is examined closely by the phenomenon called project crashing. This study introduces traditional and genetic algorithm approaches for the project crashing events and explains their steps in achieving the most efficient resource allocation. Within this context, the project crashing event is visualized, the insights of alternative approaches are described, and their implementations are illustrated with a case study. Besides, the procedures required for adopting the genetic algorithm approach to a typical problem are expressed. The case study illustration reveals the advantages and disadvantages of the genetic algorithm approach over the traditional approach. It is observed that the genetic algorithm approach can reach the solution in a single phase while the traditional approach requires multiple phases. On the other hand, the genetic algorithm approach may not reach the optimum solution unless the toolbox options are appropriately selected. This study presents the contribution of operational research to the project management body of knowledge by demonstrating the applicability and efficiency of genetic algorithm in the project crashing events. Researchers and industry practitioners may benefit from the proposed approach by following the indicated procedures to incorporate genetic algorithm into optimization issues in different fields.

Sakarya University Journal of ScienceVol. 28(5)
Sakarya University (TR), Sakarya Uygulamalı Bilimler Üniversitesi, ZHAW Zurich University of Applied Sciences (CH)
Openalex Percentile: Top 78%
Resource-Constrained Project Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Cost Minimization with Project Crashing: Comparison of the Traditional Solution and Genetic Algorithm Approach — Semih Çağlayan, Sadık Yiğit · Sakarya University Journal of Science (2024) | TGRS Research Map | TGRS