Implementation of a performance management system for environmental sustainability in an industrial organization

Abstract The paper explores the implementation of process performance management systems in the automotive industry, specifically focusing on improving the assembly line of an organization within this sector thanks to the introduction of cobots in the line of manufacturing electronic modules used in car seat control systems. With an emphasis on environmental sustainability and circular economy (CE) concepts, the study investigates the positive effects of optimizing mechanical and electromechanical systems within the assembly line. Leveraging concepts such as KAIZEN and Gemba Kaizen, along with the guiding principles of Just-In-Time (JIT), Continuous Improvement and Automation with a Human Touch (JIDOKA), the research aims to elucidate the potential benefits of such enhancements. Key performance indicators (KPIs) including Overall Equipment Effectiveness (OEE), First Pass Yield (FPY), and scrap rates were considered. Rejects, primarily stemming from human error in part handling, emerged as the major challenge facing this assembly line. To address this issue, collaborative robots were introduced to automate part handling, replacing manual processes with precise and reliable automation. Before the implementation, the cycle time stood at 13.6 units, which was reduced to 12.5 units post-implementation, resulting in a significant increase in productivity equating to 3000 more parts produced per week. OEE increasing from 80% to 87.74%, FPY rising from 96.42% to 98.48%, and the scrap rate decreasing from 0.06% to 0.02%. By addressing inefficiencies at the assembly line level, organizations can achieve significant improvements in performance metrics while concurrently contributing to a greener and more sustainable future.

Authors

Institutions

Publication Details

Journal
Journal of Physics Conference Series
Published
2024-10-01
DOI
https://doi.org/10.1088/1742-6596/2857/1/012030
Citations
3
Primary Topic
Quality and Supply Management
Type
article
Field-Weighted Citation Impact
1.59
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Implementation of a performance management system for environmental sustainability in an industrial organization

Ramona Giurea, Adrian Alexandru Tulbure, Ioan Nicolae, Elena Cristina Rada et al.
3 citations
Journal of Physics Conference Series
Quality and Supply Management
1.59
article

Implementation of a performance management system for environmental sustainability in an industrial organization

Ramona Giurea, Adrian Alexandru Tulbure, Ioan Nicolae, Elena Cristina Rada, Vincenzo Torretta, A. Karaeva, Mihai-Victor Zerbes
article en
3 citations

Abstract

Abstract The paper explores the implementation of process performance management systems in the automotive industry, specifically focusing on improving the assembly line of an organization within this sector thanks to the introduction of cobots in the line of manufacturing electronic modules used in car seat control systems. With an emphasis on environmental sustainability and circular economy (CE) concepts, the study investigates the positive effects of optimizing mechanical and electromechanical systems within the assembly line. Leveraging concepts such as KAIZEN and Gemba Kaizen, along with the guiding principles of Just-In-Time (JIT), Continuous Improvement and Automation with a Human Touch (JIDOKA), the research aims to elucidate the potential benefits of such enhancements. Key performance indicators (KPIs) including Overall Equipment Effectiveness (OEE), First Pass Yield (FPY), and scrap rates were considered. Rejects, primarily stemming from human error in part handling, emerged as the major challenge facing this assembly line. To address this issue, collaborative robots were introduced to automate part handling, replacing manual processes with precise and reliable automation. Before the implementation, the cycle time stood at 13.6 units, which was reduced to 12.5 units post-implementation, resulting in a significant increase in productivity equating to 3000 more parts produced per week. OEE increasing from 80% to 87.74%, FPY rising from 96.42% to 98.48%, and the scrap rate decreasing from 0.06% to 0.02%. By addressing inefficiencies at the assembly line level, organizations can achieve significant improvements in performance metrics while concurrently contributing to a greener and more sustainable future.

Journal of Physics Conference SeriesVol. 2857(1)
University of Insubria (IT), Lucian Blaga University of Sibiu (RO), Association for Liberty and Equality of Gender (RO), Nicolae Bălcescu Land Forces Academy (RO)
Openalex Percentile: Top 13%
Quality and Supply Management
1.59
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.