Cement Production Line Performance Improvement: A Simulation Study

One of the major challenges in manufacturing systems is addressing bottlenecks. Managers and engineers strive to find methods to eliminate bottlenecks and reduce wait times in production lines. In this study, a simulation model of a manufacturing system was analyzed, focusing on bottlenecks and underutilized machinery. Validated simulation inputs were collected to build a model for optimizing the production line. The objective was to simulate the current production line to understand and analyze its bottlenecks and propose improvement solutions. The simulation model was developed using Arena software, revealing several bottleneck stations affecting production line efficiency. A model incorporating different parts of the production line and inventory management of cement was proposed to address this problem. Various improvement steps were analyzed using the simulation model to eliminate bottlenecks and enhance production line performance. As a result, the daily production capacity of the rotary kiln increased from 3699 to 8200 tons, more than doubling the current output.

Authors

Publication Details

Journal
Industrial Engineering & Management Systems
Published
2024-09-30
DOI
https://doi.org/10.7232/iems.2024.23.3.427
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.27
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Cement Production Line Performance Improvement: A Simulation Study

F. Smaili
1 citations
Industrial Engineering & Management Systems
BIM and Construction Integration
0.27
article

Cement Production Line Performance Improvement: A Simulation Study

F. Smaili
article en
1 citations

Abstract

One of the major challenges in manufacturing systems is addressing bottlenecks. Managers and engineers strive to find methods to eliminate bottlenecks and reduce wait times in production lines. In this study, a simulation model of a manufacturing system was analyzed, focusing on bottlenecks and underutilized machinery. Validated simulation inputs were collected to build a model for optimizing the production line. The objective was to simulate the current production line to understand and analyze its bottlenecks and propose improvement solutions. The simulation model was developed using Arena software, revealing several bottleneck stations affecting production line efficiency. A model incorporating different parts of the production line and inventory management of cement was proposed to address this problem. Various improvement steps were analyzed using the simulation model to eliminate bottlenecks and enhance production line performance. As a result, the daily production capacity of the rotary kiln increased from 3699 to 8200 tons, more than doubling the current output.

Industrial Engineering & Management SystemsVol. 23(3)
Openalex Percentile: Top 43%
BIM and Construction Integration
0.27
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Cement Production Line Performance Improvement: A Simulation Study — F. Smaili · Industrial Engineering & Management Systems (2024) | TGRS Research Map | TGRS