Planning municipal drainage infrastructure maintenance operations with finite available crews: pragmatic optimization approach

This paper proposes a streamlined approach to addressing the problem of allocating finite crew resources to concurrent jobs in the context of municipal drainage infrastructure maintenance. The problem was defined from the perspective of a project manager involved in planning such operations on a day-by-day basis. The problem statement was then transformed into a simplified Integer Linear Programming optimization model. Performance metrics were devised to evaluate the optimization model’s effectiveness. A heuristic algorithm representing the decision-making process by a seasoned planner in the partner company was also developed. Both methods were applied to a case study and contrasted based on the same performance metrics. The findings underscored substantial optimization benefits in rendering decision support in resource-constrained drainage construction operations planning. In conclusion, this research presents an alternative strategy for navigating the complexities inherent in finite crew resource allocation on multiple concurrent drainage projects; lends a cost-effective optimization solution to improving the utilization of finite available crews while satisfying service demands from multiple clients to the largest extent possible.

Authors

Institutions

Publication Details

Journal
Journal of Civil Engineering and Management
Published
2024-10-11
DOI
https://doi.org/10.3846/jcem.2024.21744
Primary Topic
Water Systems and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Planning municipal drainage infrastructure maintenance operations with finite available crews: pragmatic optimization approach

Ali Bayesteh, Ming Lu, Prasanna Lakshminarasimhan
1 links
Journal of Civil Engineering and Management
Water Systems and Optimization
article

Planning municipal drainage infrastructure maintenance operations with finite available crews: pragmatic optimization approach

Ali Bayesteh, Ming Lu, Prasanna Lakshminarasimhan
article en

Abstract

This paper proposes a streamlined approach to addressing the problem of allocating finite crew resources to concurrent jobs in the context of municipal drainage infrastructure maintenance. The problem was defined from the perspective of a project manager involved in planning such operations on a day-by-day basis. The problem statement was then transformed into a simplified Integer Linear Programming optimization model. Performance metrics were devised to evaluate the optimization model’s effectiveness. A heuristic algorithm representing the decision-making process by a seasoned planner in the partner company was also developed. Both methods were applied to a case study and contrasted based on the same performance metrics. The findings underscored substantial optimization benefits in rendering decision support in resource-constrained drainage construction operations planning. In conclusion, this research presents an alternative strategy for navigating the complexities inherent in finite crew resource allocation on multiple concurrent drainage projects; lends a cost-effective optimization solution to improving the utilization of finite available crews while satisfying service demands from multiple clients to the largest extent possible.

Journal of Civil Engineering and ManagementVol. 30(8)
Alberta Environment and Protected Areas (CA), University of Alberta (CA)
Industry, innovation and infrastructure
Openalex Percentile: Top 80%
Water Systems and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Planning municipal drainage infrastructure maintenance operations with finite available crews: pragmatic optimization approach — Ali Bayesteh, Ming Lu, et al. · Journal of Civil Engineering and Management (2024) | TGRS Research Map | TGRS