Prediction and Estimation of Highway Construction Cost using Machine Learning

Cost estimation and prediction are crucial processes for the success of construction projects, especially for infrastructure development. This study analyzes historical data collected between 2011 and 2023 and investigates the relationship between construction elements and the final cost of highway construction projects in Iraq. Different cost analysis approaches, including statistical assessment and machine learning techniques, were applied to a dataset of 291 highway projects. Cost estimation is a time-consuming and risky process that requires many qualitative and quantitative parameters to be well analyzed. However, machine learning provides a comprehensive assessment tool to predict future costs. Four ANN-based models were investigated and precision was improved by combining RMSE and the correlation coefficient (R) as a controller. The results showed improvements in performance metrics, such as error reduction rate and correlation coefficient, for the models developed. The best performance was achieved at an R of 0.989. The proposed model can be effectively adapted to predict road construction costs. Despite the need for more data, the implication of the proposed model can ensure a sustainable application, saving the time and resources required by construction professionals to predict road project costs during the planning phase.

Authors

Institutions

Publication Details

Journal
Engineering Technology & Applied Science Research
Published
2024-10-09
DOI
https://doi.org/10.48084/etasr.8285
Citations
4
Primary Topic
Infrastructure Maintenance and Monitoring
Type
article
Field-Weighted Citation Impact
1.04
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Prediction and Estimation of Highway Construction Cost using Machine Learning

Yassir A. Kareem, M. Abbas, Raquim N. Zehawi
4 citations
Engineering Technology & Applied Science Research
Infrastructure Maintenance and Monitoring
1.04
article

Prediction and Estimation of Highway Construction Cost using Machine Learning

Yassir A. Kareem, M. Abbas, Raquim N. Zehawi
article en
4 citations

Abstract

Cost estimation and prediction are crucial processes for the success of construction projects, especially for infrastructure development. This study analyzes historical data collected between 2011 and 2023 and investigates the relationship between construction elements and the final cost of highway construction projects in Iraq. Different cost analysis approaches, including statistical assessment and machine learning techniques, were applied to a dataset of 291 highway projects. Cost estimation is a time-consuming and risky process that requires many qualitative and quantitative parameters to be well analyzed. However, machine learning provides a comprehensive assessment tool to predict future costs. Four ANN-based models were investigated and precision was improved by combining RMSE and the correlation coefficient (R) as a controller. The results showed improvements in performance metrics, such as error reduction rate and correlation coefficient, for the models developed. The best performance was achieved at an R of 0.989. The proposed model can be effectively adapted to predict road construction costs. Despite the need for more data, the implication of the proposed model can ensure a sustainable application, saving the time and resources required by construction professionals to predict road project costs during the planning phase.

Engineering Technology & Applied Science ResearchVol. 14(5)
University of Diyala (IQ)
Industry, innovation and infrastructure
Openalex Percentile: Top 25%
Infrastructure Maintenance and Monitoring
1.04
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.