Optimization of Interval Pumping System for Oil Wells Under New Energy Self-Consumption Scenarios

Abstract Intermittent production can significantly enhance system efficiency and reduce lifting power consumption in low-production oil wells located in low-permeability reservoirs. The original determination of pumping shut-in duration of intermittent pumping oil well was mainly based on experience, which led to the inappropriate setting of shut-in time, affecting the economic benefits of oil wells. The determination of intermittent pumping well shut-in period is based on the principle of peak cutting and valley filling. The participation of photovoltaic(PV) power generation in energy supply changes the peak and valley of electricity price. If the oil well runs according to the original system, the photovoltaic power output will exceed and the power will be abandoned during the peak period. This study proposes an optimization methodology tailored for interval pumping systems under new energy self-consumption scenarios, integrating PV power generation. Liquid level recovery tests during shutdown periods were conducted to analyze recovery patterns and identify optimal shutdown durations based on the recovery speed "inflection point". Real-time electricity price curves, incorporating both PV generation and grid consumption, facilitated the determination of rational shutdown periods aligned with electricity pricing dynamics. Implemented in Block X of the Jilin Oilfield, the study found that traditional shutdown periods of 8 to 10 hours were suboptimal. Following on-site fluid level recovery tests, shut-in periods of 4 to 6 hours were identified, corresponding to a recovery rate showing an "inflection point," thus determining a reasonable shut-in duration. Previously scheduled shutdown periods were from 9:00 to 11:30 and 15:30 to 19:00. Considering PV generation, the peak electricity pricing period from 16:00 to 21:00 was identified as the optimal shut-in period. Comparative analysis pre- and post-optimization demonstrated a reduction in abandonment rates from 7.2% to 0% and a 12% decrease in lifting electricity costs. The study highlights the effectiveness of optimizing shutdown durations based on liquid level recovery characteristics and aligning them with PV power generation, effectively mitigating surplus electricity and abandonment issues. This approach underscores its adaptability for low-yield interval pumping wells in evolving energy consumption landscapes.

Authors

Institutions

Publication Details

Published
2024-10-11
DOI
https://doi.org/10.2118/221192-ms
Primary Topic
Oil and Gas Production Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization of Interval Pumping System for Oil Wells Under New Energy Self-Consumption Scenarios

Hao Zhang, Jianguo Xu, Chuanlei Fan, K.H. Song et al.
Oil and Gas Production Techniques
article

Optimization of Interval Pumping System for Oil Wells Under New Energy Self-Consumption Scenarios

Hao Zhang, Jianguo Xu, Chuanlei Fan, K.H. Song, Yang Qing-hai
article en

Abstract

Abstract Intermittent production can significantly enhance system efficiency and reduce lifting power consumption in low-production oil wells located in low-permeability reservoirs. The original determination of pumping shut-in duration of intermittent pumping oil well was mainly based on experience, which led to the inappropriate setting of shut-in time, affecting the economic benefits of oil wells. The determination of intermittent pumping well shut-in period is based on the principle of peak cutting and valley filling. The participation of photovoltaic(PV) power generation in energy supply changes the peak and valley of electricity price. If the oil well runs according to the original system, the photovoltaic power output will exceed and the power will be abandoned during the peak period. This study proposes an optimization methodology tailored for interval pumping systems under new energy self-consumption scenarios, integrating PV power generation. Liquid level recovery tests during shutdown periods were conducted to analyze recovery patterns and identify optimal shutdown durations based on the recovery speed "inflection point". Real-time electricity price curves, incorporating both PV generation and grid consumption, facilitated the determination of rational shutdown periods aligned with electricity pricing dynamics. Implemented in Block X of the Jilin Oilfield, the study found that traditional shutdown periods of 8 to 10 hours were suboptimal. Following on-site fluid level recovery tests, shut-in periods of 4 to 6 hours were identified, corresponding to a recovery rate showing an "inflection point," thus determining a reasonable shut-in duration. Previously scheduled shutdown periods were from 9:00 to 11:30 and 15:30 to 19:00. Considering PV generation, the peak electricity pricing period from 16:00 to 21:00 was identified as the optimal shut-in period. Comparative analysis pre- and post-optimization demonstrated a reduction in abandonment rates from 7.2% to 0% and a 12% decrease in lifting electricity costs. The study highlights the effectiveness of optimizing shutdown durations based on liquid level recovery characteristics and aligning them with PV power generation, effectively mitigating surplus electricity and abandonment issues. This approach underscores its adaptability for low-yield interval pumping wells in evolving energy consumption landscapes.

Research Institute of Petroleum Exploration and Development (CN), China National Petroleum Corporation (China) (CN)
Affordable and clean energy
Openalex Percentile: Top 78%
Oil and Gas Production Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.