Methodology of evaluating of factors affecting the efficiency of construction project implementation by general contracting organization in Fit-out direction

Introduction. The demand for interior design services (Fit-out) in Russia began to grow actively in recent years, so the research in this area, aimed at improving the efficiency of project implementation, is relevant. Despite the relevance of this direction in our country, in the scientific community the topic of interior design (Fit-out) is touched upon only in the field of BIM modelling. The stages of research on revealing the dependence of the choice of organizational and technological solutions by general contracting organization on the terms of construction project implementation in the direction of Fit-out are presented. Materials and methods. Literary sources, scientific publications, Internet resources were studied. The analysis of design and estimate, production, organizational and technological, executive, tender, financial and reporting and other documentation, with which the studied factors affecting the efficiency of construction project implementation by general contracting organization in the direction of Fit-out are connected, is carried out. Results. The dependence of the identified factors and the analyzed documentation is determined. The performance criterion — the period of realization of the construction project Fit-out is established. As a tool for assessing the efficiency of construction project realization “Complex indicator of efficiency of construction project Fit-out” is accepted. The formed system will be the basis for the development of a methodology for determining the efficiency of construction project implementation by the general contracting organization in the direction of Fit-out. Conclusions. Completed projects are required to be evaluated for achievement of the company’s objectives and quality of work. These evaluations can serve as feedback for future projects and for process improvement. In addition, these evaluations can be used to make adjustments to organizational, technological and management decisions during the construction process to achieve goals.

Authors

Institutions

Publication Details

Journal
Vestnik MGSU
Published
2024-09-30
DOI
https://doi.org/10.22227/1997-0935.2024.9.1562-1569
Citations
2
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.53
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Methodology of evaluating of factors affecting the efficiency of construction project implementation by general contracting organization in Fit-out direction

T. Kh. Bidov, Alan Khubaev, E. A. Pomytko, A. D. Kotelnikova
2 citations
Vestnik MGSU
BIM and Construction Integration
0.53
article

Methodology of evaluating of factors affecting the efficiency of construction project implementation by general contracting organization in Fit-out direction

T. Kh. Bidov, Alan Khubaev, E. A. Pomytko, A. D. Kotelnikova
article en
2 citations

Abstract

Introduction. The demand for interior design services (Fit-out) in Russia began to grow actively in recent years, so the research in this area, aimed at improving the efficiency of project implementation, is relevant. Despite the relevance of this direction in our country, in the scientific community the topic of interior design (Fit-out) is touched upon only in the field of BIM modelling. The stages of research on revealing the dependence of the choice of organizational and technological solutions by general contracting organization on the terms of construction project implementation in the direction of Fit-out are presented. Materials and methods. Literary sources, scientific publications, Internet resources were studied. The analysis of design and estimate, production, organizational and technological, executive, tender, financial and reporting and other documentation, with which the studied factors affecting the efficiency of construction project implementation by general contracting organization in the direction of Fit-out are connected, is carried out. Results. The dependence of the identified factors and the analyzed documentation is determined. The performance criterion — the period of realization of the construction project Fit-out is established. As a tool for assessing the efficiency of construction project realization “Complex indicator of efficiency of construction project Fit-out” is accepted. The formed system will be the basis for the development of a methodology for determining the efficiency of construction project implementation by the general contracting organization in the direction of Fit-out. Conclusions. Completed projects are required to be evaluated for achievement of the company’s objectives and quality of work. These evaluations can serve as feedback for future projects and for process improvement. In addition, these evaluations can be used to make adjustments to organizational, technological and management decisions during the construction process to achieve goals.

Vestnik MGSUVol. 19(9)
Moscow State University of Civil Engineering (RU)
Openalex Percentile: Top 34%
BIM and Construction Integration
0.53
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.