Device for Load-Redistribution between Existing Piles and Underpinning Micropiles

A micropile preloading method using bolt-fastening was studied to improve the constructability and economic feasibility of underpinning micropiles for the vertical expansion of a building with existing pile foundation. Due to the close distance between the existing piles and new micropiles, and the difference in their stiffness, precise control of preloading is required for the micropiles. A new preloading device was developed for this purpose. The laboratory test showed that for precise control of preloading, direct bolt-fastening (like the bolt connection for steel structures) was better than the typical hydraulic jacking method. The results of laboratory and onsite tests showed that the proposed preloading device adequately redistributed the bearing load between the existing piles and underpinning micropiles. Further load-redistribution was also possible by applying post-loading to the micropiles with continuous long-term measurement of bearing force whenever it was needed, even after the construction of the building expansion.

Authors

Institutions

Publication Details

Journal
Journal of Geotechnical and Geoenvironmental Engineering
Published
2024-10-08
DOI
https://doi.org/10.1061/jggefk.gteng-12706
Citations
1
Primary Topic
Geotechnical Engineering and Soil Stabilization
Type
article
Field-Weighted Citation Impact
0.26
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Device for Load-Redistribution between Existing Piles and Underpinning Micropiles

Hong‐Gun Park, Hyeon‐Jong Hwang, Choong-Ki Chung, Sung-Hyun Kim et al.
1 citations
Journal of Geotechnical and Geoenvironmental Engineering
Geotechnical Engineering and Soil Stabilization
0.26
article

Device for Load-Redistribution between Existing Piles and Underpinning Micropiles

Hong‐Gun Park, Hyeon‐Jong Hwang, Choong-Ki Chung, Sung-Hyun Kim, Jae-Han Oh
article en
1 citations

Abstract

A micropile preloading method using bolt-fastening was studied to improve the constructability and economic feasibility of underpinning micropiles for the vertical expansion of a building with existing pile foundation. Due to the close distance between the existing piles and new micropiles, and the difference in their stiffness, precise control of preloading is required for the micropiles. A new preloading device was developed for this purpose. The laboratory test showed that for precise control of preloading, direct bolt-fastening (like the bolt connection for steel structures) was better than the typical hydraulic jacking method. The results of laboratory and onsite tests showed that the proposed preloading device adequately redistributed the bearing load between the existing piles and underpinning micropiles. Further load-redistribution was also possible by applying post-loading to the micropiles with continuous long-term measurement of bearing force whenever it was needed, even after the construction of the building expansion.

Journal of Geotechnical and Geoenvironmental EngineeringVol. 150(12)
Seoul National University (KR), Soongsil University (KR), Konkuk University (KR)
Climate action
Openalex Percentile: Top 44%
Geotechnical Engineering and Soil Stabilization
0.26
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.