Analysis of industrial floor damege and deformation on a expansive slag

The paper discusses an industrial floor that was constructed on a reactive slag subbase. Five years after completion, the user reported damage caused by floor displacement. Cracks and scratches were observed in the finishing layers, particularly at the connection between the partition walls and the floor. Geotechnical and surveying investigations were carried out to determine the cause of the damage. The investigations revealed the presence of reactive slag as the subbase layer. Floor displacement measurements were taken over a four-year period, from November 2019 to November 2023. Despite being ten years since construction, uplift continues to occur. The average annual increase in displacement for the entire floor over the past three years is 6 mm, with a maximum displacement of 80 mm at the midpoint of the floor. The ongoing increase in displacement and damage makes repairing the building and maintaining its use impossible. Microscopic examinations and geodetic measurements do not indicate a stopping of the expansion processes of the subbase.

Authors

Institutions

Publication Details

Journal
Inżynieria i Budownictwo.
Published
2024-08-30
DOI
https://doi.org/10.5604/01.3001.0054.7117
Citations
1
Primary Topic
Metallurgical Processes and Thermodynamics
Type
article
Field-Weighted Citation Impact
0.21
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of industrial floor damege and deformation on a expansive slag

S. Kwiecień, Jakub Zając, Łukasz Drobiec, Krzysztof Grzyb et al.
1 citations
Inżynieria i Budownictwo.
Metallurgical Processes and Thermodynamics
0.21
article

Analysis of industrial floor damege and deformation on a expansive slag

S. Kwiecień, Jakub Zając, Łukasz Drobiec, Krzysztof Grzyb, Julia Blazy
article en
1 citations

Abstract

The paper discusses an industrial floor that was constructed on a reactive slag subbase. Five years after completion, the user reported damage caused by floor displacement. Cracks and scratches were observed in the finishing layers, particularly at the connection between the partition walls and the floor. Geotechnical and surveying investigations were carried out to determine the cause of the damage. The investigations revealed the presence of reactive slag as the subbase layer. Floor displacement measurements were taken over a four-year period, from November 2019 to November 2023. Despite being ten years since construction, uplift continues to occur. The average annual increase in displacement for the entire floor over the past three years is 6 mm, with a maximum displacement of 80 mm at the midpoint of the floor. The ongoing increase in displacement and damage makes repairing the building and maintaining its use impossible. Microscopic examinations and geodetic measurements do not indicate a stopping of the expansion processes of the subbase.

Inżynieria i Budownictwo.Vol. LXXX(5)
Silesian University of Technology (PL), General Electric (Poland) (PL)
Sustainable cities and communities
Openalex Percentile: Top 51%
Metallurgical Processes and Thermodynamics
0.21
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.