The Effectiveness of Implementing a Milling Process in Reducing Production Process and Costs: A Case Study
Every product's design has a different process flow. Sometimes, designed products consist of a repeated process flow. Repeated processes are a problem that can affect production management and production output. This study has potentially proposed a new process that can replace the existing process by adding a milling process. The result shows that introducing a milling process was added to item 2 to produce a step slot and reduced the number of items used (Item 3). The assembly of Item 2 and Item 3 was converted into Item 6, which showcases a more substantial time differential, with the existing process taking 12.25 minutes and the new process requiring 0 minutes. The additional process of the new alternative milling machine reveals lower Watt, less time duration for the welding machine, reduced energy consumption for a hand-grinding machine, and lower cost demand for the welding machine than the existing process. In addition, the total cost of the added milling process shows a slight reduction in overall cost and is associated with energy consumption.
Authors
- Shahrul Azmir Osman (ORCID: https://orcid.org/0000-0001-9036-6628)
- Saliza Azlina Osman
- Nur Fitrah Dainil
Institutions
- Tun Hussein Onn University of Malaysia (MY)
Publication Details
- Journal
- Journal of Advanced Research in Applied Sciences and Engineering Technology
- Published
- 2024-10-08
- DOI
- https://doi.org/10.37934/aram.60.1.265277
- Primary Topic
- Manufacturing Process and Optimization
- Type
- article
- Field-Weighted Citation Impact
- 0.00