ASSESSMENT OF QUALITY MANAGEMENT SYSTEM IN THE PROCESS OF CONSTRUCTION OF THE BISHKEK-NARYN-TORUGART MOTORWAY IN THE KYRGYZ REPUBLIC

The study focuses on the quality management system during the construction of the Bishkek-Naryn-Torugart motorway in the Kyrgyz Republic. It aims to analyse key aspects of quality management, identify problematic issues and propose recommendations for improvement. The methodology includes analyses of regulatory documents, technical specifications and data collected during the monitoring of construction works. The main focus is on quality control of materials, construction techniques and compliance of completed works with standards. The analysis of data, regulatory framework and practical experience helps to identify the main problems and propose recommendations for improving quality management in road infrastructure construction. The study aims to improve the efficiency of road construction project management and ensure an increased level of quality of road infrastructure in the country. As a result, the key factors affecting the effectiveness of the quality management system in the construction of a motorway are identified. Recommendations on optimisation of quality management processes to improve the level of work performance and ensure long-term sustainability of the Bishkek-Naryn-Torugart road infrastructure in the Kyrgyz Republic are proposed.

Authors

Publication Details

Journal
Alatoo Academic Studies
Published
2024-08-30
DOI
https://doi.org/10.17015/aas.2024.242.24
Primary Topic
Engineering and Environmental Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ASSESSMENT OF QUALITY MANAGEMENT SYSTEM IN THE PROCESS OF CONSTRUCTION OF THE BISHKEK-NARYN-TORUGART MOTORWAY IN THE KYRGYZ REPUBLIC

Dinara Zhenishbekova
Alatoo Academic Studies
Engineering and Environmental Studies
article

ASSESSMENT OF QUALITY MANAGEMENT SYSTEM IN THE PROCESS OF CONSTRUCTION OF THE BISHKEK-NARYN-TORUGART MOTORWAY IN THE KYRGYZ REPUBLIC

Dinara Zhenishbekova
article en

Abstract

The study focuses on the quality management system during the construction of the Bishkek-Naryn-Torugart motorway in the Kyrgyz Republic. It aims to analyse key aspects of quality management, identify problematic issues and propose recommendations for improvement. The methodology includes analyses of regulatory documents, technical specifications and data collected during the monitoring of construction works. The main focus is on quality control of materials, construction techniques and compliance of completed works with standards. The analysis of data, regulatory framework and practical experience helps to identify the main problems and propose recommendations for improving quality management in road infrastructure construction. The study aims to improve the efficiency of road construction project management and ensure an increased level of quality of road infrastructure in the country. As a result, the key factors affecting the effectiveness of the quality management system in the construction of a motorway are identified. Recommendations on optimisation of quality management processes to improve the level of work performance and ensure long-term sustainability of the Bishkek-Naryn-Torugart road infrastructure in the Kyrgyz Republic are proposed.

Alatoo Academic StudiesVol. 24(2)
Openalex Percentile: Top 78%
Engineering and Environmental Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.