Optimization of small coal pillar width and control measures in gob-side entry excavation of thick coal seams

This study introduces an innovative optimized bolting support system specifically tailored for gob-side entry excavation in thick coal seams at a coal mine in southwestern Shandong, China. Employing theoretical analysis, numerical simulation, and field measurements, the research focuses on examining the failure characteristics of surrounding rock during gob-side entry excavation. The key innovation lies in the development of a 5-meter optimal coal pillar width, ensuring balanced stress distribution and structural integrity. Additionally, a lag time of at least 46 days between gob-side entry excavation and the upper working face retreat is recommended to mitigate roof subsidence and surrounding rock deformation. The optimized bolting support system, featuring increased bolt pretension, utilization of high-strength steel strips, and reinforcement of weak points, effectively reduces deformation of the roadway surrounding rock, meeting support requirements for normal production. This novel approach successfully addresses the support challenges in thick coal seam gob-side entry excavation, enhancing mining safety and resource recovery rates.

Authors

Institutions

Publication Details

Journal
Scientific Reports
Published
2024-10-07
DOI
https://doi.org/10.1038/s41598-024-74793-8
Citations
14
Primary Topic
Rock Mechanics and Modeling
Type
article
Field-Weighted Citation Impact
3.77

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization of small coal pillar width and control measures in gob-side entry excavation of thick coal seams

Yan-ping Xue
14 citations
Scientific Reports
Rock Mechanics and Modeling
3.77
article

Optimization of small coal pillar width and control measures in gob-side entry excavation of thick coal seams

Yan-ping Xue
article en
14 citations

Abstract

This study introduces an innovative optimized bolting support system specifically tailored for gob-side entry excavation in thick coal seams at a coal mine in southwestern Shandong, China. Employing theoretical analysis, numerical simulation, and field measurements, the research focuses on examining the failure characteristics of surrounding rock during gob-side entry excavation. The key innovation lies in the development of a 5-meter optimal coal pillar width, ensuring balanced stress distribution and structural integrity. Additionally, a lag time of at least 46 days between gob-side entry excavation and the upper working face retreat is recommended to mitigate roof subsidence and surrounding rock deformation. The optimized bolting support system, featuring increased bolt pretension, utilization of high-strength steel strips, and reinforcement of weak points, effectively reduces deformation of the roadway surrounding rock, meeting support requirements for normal production. This novel approach successfully addresses the support challenges in thick coal seam gob-side entry excavation, enhancing mining safety and resource recovery rates.

Scientific ReportsVol. 14(1)
CCTEG Shenyang Research Institute (CN)
National Key Research and Development Program of China
Openalex Percentile: Top 6%
Rock Mechanics and Modeling
3.77
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.