Recovery of Magnetic Ni Particles from Spent Catalyst Leachate by Direct Cementation

An alternative method based on cementation for the recovery of nickel from spent Ni/Al2O3 reforming catalyst pregnant leach solution (PLS) was proposed to overcome the limitations of traditional two-step extraction and precipitation processes. Thermodynamic analysis was used to evaluate the potential interference of key reactions, such as nickel and sacrificial metal leaching, with the selective cementation of nickel from the PLS. Key variables in the cementation process were optimized using response surface methodology (RSM) combined with Box–Behnken design (BBD). Under optimal conditions—pH 2.2 ± 0.1, processing time of 15 min, and Al/Ni molar ratio of 2.65—a maximum nickel recovery of 73.2% was achieved. Extensive characterization confirmed the high quality of the cemented nickel product: (i) ICP-OES indicated nickel purity of 99.47%, (ii) XRD patterns verified the presence of pure face-centered cubic nickel, (iii) SEM-EDS and vibrating sample magnetometry confirmed the high purity of the metallic nickel particles.

Authors

Institutions

Publication Details

Journal
Sustainability
Published
2024-10-05
DOI
https://doi.org/10.3390/su16198630
Citations
4
Primary Topic
Extraction and Separation Processes
Type
article
Field-Weighted Citation Impact
0.85
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Recovery of Magnetic Ni Particles from Spent Catalyst Leachate by Direct Cementation

Farhad Moosakazemi, Faı̈çal Larachi, Sina Ghassa, Ali Entezari-Zarandi
4 citations
Sustainability
Extraction and Separation Processes
0.85
article

Recovery of Magnetic Ni Particles from Spent Catalyst Leachate by Direct Cementation

Farhad Moosakazemi, Faı̈çal Larachi, Sina Ghassa, Ali Entezari-Zarandi
article en
4 citations

Abstract

An alternative method based on cementation for the recovery of nickel from spent Ni/Al2O3 reforming catalyst pregnant leach solution (PLS) was proposed to overcome the limitations of traditional two-step extraction and precipitation processes. Thermodynamic analysis was used to evaluate the potential interference of key reactions, such as nickel and sacrificial metal leaching, with the selective cementation of nickel from the PLS. Key variables in the cementation process were optimized using response surface methodology (RSM) combined with Box–Behnken design (BBD). Under optimal conditions—pH 2.2 ± 0.1, processing time of 15 min, and Al/Ni molar ratio of 2.65—a maximum nickel recovery of 73.2% was achieved. Extensive characterization confirmed the high quality of the cemented nickel product: (i) ICP-OES indicated nickel purity of 99.47%, (ii) XRD patterns verified the presence of pure face-centered cubic nickel, (iii) SEM-EDS and vibrating sample magnetometry confirmed the high purity of the metallic nickel particles.

SustainabilityVol. 16(19)
University of Tehran (IR), Université Laval (CA)
Clean water and sanitation
Openalex Percentile: Top 30%
Extraction and Separation Processes
0.85
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.