Optimizing Multi-Stage Project Portfolio Selection Considering Integrating Lifecycle and Interactions

Project portfolio selection is essential for a company to achieve its strategic goals. Due to constraints such as budget and manpower, companies cannot undertake all projects simultaneously and must prioritize those offering the highest value. Projects often interact and progress through various phases, adding complexity to the selection process. To address these challenges, this study introduces a model that accounts for the multi-stage execution of projects, their interactions, and multiple objectives. A novel multi-objective optimization algorithm is developed to solve this problem, along with a refined project selection method designed to offer decision-makers enhanced insights. Finally, a numerical example is provided to demonstrate the effectiveness of the proposed approach.

Authors

Institutions

Publication Details

Journal
Systems
Published
2024-10-05
DOI
https://doi.org/10.3390/systems12100414
Citations
3
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
1.47

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimizing Multi-Stage Project Portfolio Selection Considering Integrating Lifecycle and Interactions

Biaobiao Qiu, Ziyi Chen, Yajie Dou
3 citations
Systems
Resource-Constrained Project Scheduling
1.47
article

Optimizing Multi-Stage Project Portfolio Selection Considering Integrating Lifecycle and Interactions

Biaobiao Qiu, Ziyi Chen, Yajie Dou
article en
3 citations

Abstract

Project portfolio selection is essential for a company to achieve its strategic goals. Due to constraints such as budget and manpower, companies cannot undertake all projects simultaneously and must prioritize those offering the highest value. Projects often interact and progress through various phases, adding complexity to the selection process. To address these challenges, this study introduces a model that accounts for the multi-stage execution of projects, their interactions, and multiple objectives. A novel multi-objective optimization algorithm is developed to solve this problem, along with a refined project selection method designed to offer decision-makers enhanced insights. Finally, a numerical example is provided to demonstrate the effectiveness of the proposed approach.

SystemsVol. 12(10)
National University of Defense Technology (CN)
National Science Foundation, National Natural Science Foundation of China, National University of Defense Technology
Openalex Percentile: Top 16%
Resource-Constrained Project Scheduling
1.47
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.