Decommissioning of a fuel oil-fired thermoelectric power plant in Brazil - Economic feasibility under certain and risk conditions

• Deterministic and stochastic economic analysis of the demobilization process. • Even in the face of uncertainty, shareholders can expect a financial profit. • Policies must be aligned with the transition to renewable energy sources in Brazil. The strategic analysis for the decommissioning of thermoelectric plants is seen as a trend for the coming years. The search for renewable alternatives should stimulate investment in other energy sources, reducing the number of thermoelectric plants in the energy generation system. However, few studies have dealt with the decommissioning of oil-fired thermoelectric plants. In this work, the methodology was applied under deterministic and stochastic conditions using methods of net present value (NPV), internal rate of return (IRR), discounted payback, capital asset pricing model (CAPM) and weighted average cost of capital (WACC). The results showed that the deterministic NPV was positive, ranging from R$101.30 million (pessimistic scenario) to R$109.73 million (optimistic scenario). The IRR was higher than the WACC of 10.55%, ranging from 13.50% to 13.68% per year. For the Monte Carlo simulation, NPV was observed with 100% certainty of viability and the probabilities of occurrence allowed more analysis of the risks involved than those obtained by deterministic methods. this study contributes to future decommissioning projects in Brazil, considering the scenario of stimulating renewable sources and the energy transition, helping managers make decisions about their projects. In addition, it helps guide public policies that can optimize the decommissioning process and strengthen the national energy sector.

Authors

Institutions

Publication Details

Journal
Sustainable Futures
Published
2024-10-06
DOI
https://doi.org/10.1016/j.sftr.2024.100332
Citations
2
Primary Topic
Marine and Offshore Engineering Studies
Type
article
Field-Weighted Citation Impact
0.67
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Decommissioning of a fuel oil-fired thermoelectric power plant in Brazil - Economic feasibility under certain and risk conditions

João Carlos de Oliveira Mello, Roberto Castro, Edvaldo Pereira Santos Júnior, Wilton Lima Sousa et al.
2 citations
Sustainable Futures
Marine and Offshore Engineering Studies
0.67
article

Decommissioning of a fuel oil-fired thermoelectric power plant in Brazil - Economic feasibility under certain and risk conditions

João Carlos de Oliveira Mello, Roberto Castro, Edvaldo Pereira Santos Júnior, Wilton Lima Sousa, Luiz Célio Souza Rocha, Dorel Soares Ramos, Camila S. Gehrke, Amadeu Junior da Silva Fonseca, Luiz Moreira Coelho
article en
2 citations

Abstract

• Deterministic and stochastic economic analysis of the demobilization process. • Even in the face of uncertainty, shareholders can expect a financial profit. • Policies must be aligned with the transition to renewable energy sources in Brazil. The strategic analysis for the decommissioning of thermoelectric plants is seen as a trend for the coming years. The search for renewable alternatives should stimulate investment in other energy sources, reducing the number of thermoelectric plants in the energy generation system. However, few studies have dealt with the decommissioning of oil-fired thermoelectric plants. In this work, the methodology was applied under deterministic and stochastic conditions using methods of net present value (NPV), internal rate of return (IRR), discounted payback, capital asset pricing model (CAPM) and weighted average cost of capital (WACC). The results showed that the deterministic NPV was positive, ranging from R$101.30 million (pessimistic scenario) to R$109.73 million (optimistic scenario). The IRR was higher than the WACC of 10.55%, ranging from 13.50% to 13.68% per year. For the Monte Carlo simulation, NPV was observed with 100% certainty of viability and the probabilities of occurrence allowed more analysis of the risks involved than those obtained by deterministic methods. this study contributes to future decommissioning projects in Brazil, considering the scenario of stimulating renewable sources and the energy transition, helping managers make decisions about their projects. In addition, it helps guide public policies that can optimize the decommissioning process and strengthen the national energy sector.

Sustainable FuturesVol. 8
Universidade Federal da Paraíba (BR), Universidade de São Paulo (BR), Universidade Federal de Pernambuco (BR), Instituto Federal de Educação Ciência e Tecnologia da Paraíba (BR), Elabora Consultoria (Brazil) (BR)
Affordable and clean energy
Openalex Percentile: Top 31%
Marine and Offshore Engineering Studies
0.67
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.