Factors Affecting the Timely Construction of National Pride Projects of Nepal: A Case Study Of KTFT Road Project

This article provides an insight of the factors that could cause delay in the timely construction of road projects in Nepal pivoting to the Nepal’s first expressway: Kathmandu-Terai/Madhesh Fast Track Road Project. The major factors considered for the study are: geographic and environmental factors, regulatory and legal factors, socioeconomic factors, technology and innovation, finance and funding factor, political and security factor. From this research survey it is concluded that the Regulatory and Legal factors is found to be the most significant factors influencing the timely construction of the road projects in Nepal including KTFT and the least importance from the survey is determined to be the geological and environmental factor. Hence, it is recommended to focus on the Legal and Regulatory part for the concerned stakeholders in order to succeed in this type of Mega Projects in Nepal.

Authors

Institutions

Publication Details

Journal
KTFT journal.
Published
2024-10-04
DOI
https://doi.org/10.3126/ktftj.v4i1.70170
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Factors Affecting the Timely Construction of National Pride Projects of Nepal: A Case Study Of KTFT Road Project

A. S. Dhakal, Sapana Pathak
KTFT journal.
Construction Project Management and Performance
article

Factors Affecting the Timely Construction of National Pride Projects of Nepal: A Case Study Of KTFT Road Project

A. S. Dhakal, Sapana Pathak
article en

Abstract

This article provides an insight of the factors that could cause delay in the timely construction of road projects in Nepal pivoting to the Nepal’s first expressway: Kathmandu-Terai/Madhesh Fast Track Road Project. The major factors considered for the study are: geographic and environmental factors, regulatory and legal factors, socioeconomic factors, technology and innovation, finance and funding factor, political and security factor. From this research survey it is concluded that the Regulatory and Legal factors is found to be the most significant factors influencing the timely construction of the road projects in Nepal including KTFT and the least importance from the survey is determined to be the geological and environmental factor. Hence, it is recommended to focus on the Legal and Regulatory part for the concerned stakeholders in order to succeed in this type of Mega Projects in Nepal.

KTFT journal.Vol. 4
United States Department of the Army (US), Tribhuvan University (NP)
Industry, innovation and infrastructure
Openalex Percentile: Top 79%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Factors Affecting the Timely Construction of National Pride Projects of Nepal: A Case Study Of KTFT Road Project — A. S. Dhakal, Sapana Pathak · KTFT journal. (2024) | TGRS Research Map | TGRS