Estimasi Cadangan Batugamping Menggunakan Block Model Berdasarkan Metode Interpolasi IDW pada IUP OP 231 Karangkemojing

The increasing development of infrastructure development has an impact on the increase in cement demand. Cement is used as the main raw material in making concrete and other construction materials. Therefore, limestone mining as a raw material for cement is also increasing. One of the areas that has prospects for limestone mining is IUP OP 231 Karangkemojing which is still in the exploration stage. The purpose of this study is to determine the geological and geomorphological conditions of the study area, determine the amount of limestone reserves, and determine the estimated mine life based on production targets. The methods used in this research are field observation and laboratory analysis including petrographic analysis and X-Ray Fluorescence (XRF) analysis. Furthermore, the calculation of limestone reserves was carried out using block modeling and the Inverse Distance Weighting (IDW) interpolation method processed using Surpac software. Based on field geological mapping, the research area is included in the wavy hilly and steep hilly structural landforms, which consist of two lithological units, namely sandstone and claystone intermixture units and limestone units. The results of the calculation of limestone reserves in the study area were obtained at 61,444,362 tons with an estimated mine life of about 24 years and 6 months.

Authors

Institutions

Publication Details

Journal
MINERAL
Published
2024-09-26
DOI
https://doi.org/10.33019/mineral.v9i2.4710
Primary Topic
Mining Techniques and Economics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Estimasi Cadangan Batugamping Menggunakan Block Model Berdasarkan Metode Interpolasi IDW pada IUP OP 231 Karangkemojing

Narulita Santi, Agyun Kinanti Fauziyah Pertiwi
MINERAL
Mining Techniques and Economics
article

Estimasi Cadangan Batugamping Menggunakan Block Model Berdasarkan Metode Interpolasi IDW pada IUP OP 231 Karangkemojing

Narulita Santi, Agyun Kinanti Fauziyah Pertiwi
article en

Abstract

The increasing development of infrastructure development has an impact on the increase in cement demand. Cement is used as the main raw material in making concrete and other construction materials. Therefore, limestone mining as a raw material for cement is also increasing. One of the areas that has prospects for limestone mining is IUP OP 231 Karangkemojing which is still in the exploration stage. The purpose of this study is to determine the geological and geomorphological conditions of the study area, determine the amount of limestone reserves, and determine the estimated mine life based on production targets. The methods used in this research are field observation and laboratory analysis including petrographic analysis and X-Ray Fluorescence (XRF) analysis. Furthermore, the calculation of limestone reserves was carried out using block modeling and the Inverse Distance Weighting (IDW) interpolation method processed using Surpac software. Based on field geological mapping, the research area is included in the wavy hilly and steep hilly structural landforms, which consist of two lithological units, namely sandstone and claystone intermixture units and limestone units. The results of the calculation of limestone reserves in the study area were obtained at 61,444,362 tons with an estimated mine life of about 24 years and 6 months.

MINERALVol. 9(2)
Diponegoro University (ID)
Openalex Percentile: Top 81%
Mining Techniques and Economics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Estimasi Cadangan Batugamping Menggunakan Block Model Berdasarkan Metode Interpolasi IDW pada IUP OP 231 Karangkemojing — Narulita Santi, Agyun Kinanti Fauziyah Pertiwi · MINERAL (2024) | TGRS Research Map | TGRS