A comparative analysis of project performance: Public–Private Partnership (P3) Highway Projects vs. Design-Build (DB) and Design-Bid-Build (DBB) Highway Projects

Public–private partnerships (P3) have become increasingly significant in both advanced and emerging economies in recent years. In the United States, P3 contracts have been utilized across a wide range of infrastructure sectors. However, it is crucial to evaluate how P3 projects perform in terms of cost and schedule compared to traditional project delivery methods to make informed decisions. This study focuses on comparing the performance of P3 highway projects with those delivered through design-build (DB) and design-bid-build (DBB) methods, particularly in terms of cost and schedule growth. Statistical analyses revealed that P3 highway projects showed a mean cost growth of 2.12%, whereas DB projects recorded 8.95% and DBB projects 7.27%. In terms of schedule growth, P3 projects had a mean growth of 0.59%, while DB projects experienced 37.94% and DBB projects 31.39%. These findings provide valuable insights to support decision-making for future projects, benefiting government agencies, private companies, and other stakeholders in infrastructure development. The results can assist in choosing the appropriate project delivery method, potentially minimizing disputes and project failures.

Authors

Institutions

Publication Details

Journal
World Journal of Advanced Research and Reviews
Published
2024-09-30
DOI
https://doi.org/10.30574/wjarr.2024.23.3.2904
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A comparative analysis of project performance: Public–Private Partnership (P3) Highway Projects vs. Design-Build (DB) and Design-Bid-Build (DBB) Highway Projects

Ruchit Parekh
1 links
World Journal of Advanced Research and Reviews
Construction Project Management and Performance
article

A comparative analysis of project performance: Public–Private Partnership (P3) Highway Projects vs. Design-Build (DB) and Design-Bid-Build (DBB) Highway Projects

Ruchit Parekh
article en

Abstract

Public–private partnerships (P3) have become increasingly significant in both advanced and emerging economies in recent years. In the United States, P3 contracts have been utilized across a wide range of infrastructure sectors. However, it is crucial to evaluate how P3 projects perform in terms of cost and schedule compared to traditional project delivery methods to make informed decisions. This study focuses on comparing the performance of P3 highway projects with those delivered through design-build (DB) and design-bid-build (DBB) methods, particularly in terms of cost and schedule growth. Statistical analyses revealed that P3 highway projects showed a mean cost growth of 2.12%, whereas DB projects recorded 8.95% and DBB projects 7.27%. In terms of schedule growth, P3 projects had a mean growth of 0.59%, while DB projects experienced 37.94% and DBB projects 31.39%. These findings provide valuable insights to support decision-making for future projects, benefiting government agencies, private companies, and other stakeholders in infrastructure development. The results can assist in choosing the appropriate project delivery method, potentially minimizing disputes and project failures.

World Journal of Advanced Research and ReviewsVol. 23(3)
Hofstra University (US)
Openalex Percentile: Top 80%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.