Analysis of Excavation Methods Against Deformation in Highway Tunnels

Cisumdawu tunnel is a highway tunnelling which composed of very weak rock mass conditions has an average compressive strength less than 1 MPa. It is located below groundwater level. The shape of tunnell is horseshoe, diameter of tunnel section 14,413 m and height 11,083 m. Cisumdawu tunnel is a shallow tunnel which has a maximum overburden of 52,8 m and minimum overburden approximately 14 m. In the case of shallow tunnel which has a large section could be lead an instability during tunnel construction. Tunnel deformation analysis is using an observation and numerical modelling approach with finite element method which is assisted by RS 2019 (Rocscience) software. Based on the research is obtained that excavation method greatly affects the level of deformation that occurs during tunnel construction. As tunnelling advanced, Vertical displacement in the longitudinal direction using three bench seven step excavation method is smaller than full face and bench excavtion method. The maximum displacement using three bench excavation method is -4.23 mm, the full face method is -5.51 mm and the bench method is -4.91 mm. The amount of displacement is affected by the length of excavation and stage in tunnelling. The rate of deformation is increasing as the length of excavation getting deeper, but this is applied in unsupported tunnel.

Authors

Publication Details

Journal
Journal La Multiapp
Published
2024-10-02
DOI
https://doi.org/10.37899/journallamultiapp.v5i5.1579
Primary Topic
Civil and Geotechnical Engineering Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of Excavation Methods Against Deformation in Highway Tunnels

Singgih Saptono, Dian Eka Aryanti
Journal La Multiapp
Civil and Geotechnical Engineering Research
article

Analysis of Excavation Methods Against Deformation in Highway Tunnels

Singgih Saptono, Dian Eka Aryanti
article en

Abstract

Cisumdawu tunnel is a highway tunnelling which composed of very weak rock mass conditions has an average compressive strength less than 1 MPa. It is located below groundwater level. The shape of tunnell is horseshoe, diameter of tunnel section 14,413 m and height 11,083 m. Cisumdawu tunnel is a shallow tunnel which has a maximum overburden of 52,8 m and minimum overburden approximately 14 m. In the case of shallow tunnel which has a large section could be lead an instability during tunnel construction. Tunnel deformation analysis is using an observation and numerical modelling approach with finite element method which is assisted by RS 2019 (Rocscience) software. Based on the research is obtained that excavation method greatly affects the level of deformation that occurs during tunnel construction. As tunnelling advanced, Vertical displacement in the longitudinal direction using three bench seven step excavation method is smaller than full face and bench excavtion method. The maximum displacement using three bench excavation method is -4.23 mm, the full face method is -5.51 mm and the bench method is -4.91 mm. The amount of displacement is affected by the length of excavation and stage in tunnelling. The rate of deformation is increasing as the length of excavation getting deeper, but this is applied in unsupported tunnel.

Journal La MultiappVol. 5(5)
Openalex Percentile: Top 65%
Civil and Geotechnical Engineering Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.