Feasibility Study of Temperature Control Measures during the Construction of Large-Volume Concrete Gravity Dams in Cold Regions: A Case Study

Effective temperature control measures are crucial for achieving temperature regulation and preventing cracking in the dam body during the construction of large-volume concrete gravity dams. Due to the low ambient temperatures in winter, it is especially important to focus on temperature control measures for concrete dam construction in cold regions. This paper employs a numerical simulation method that takes into account dam temperature control measures to simulate and predict the overall temperature and stress fields of the Guanmenzuizi Reservoir Dam, and validates these simulations with field monitoring results. This study finds that the ambient temperature significantly impacts the temperature and stress of the dam body’s concrete. The internal temperature of the dam reaches its highest value approximately 7 days after pouring, followed by periodic fluctuations, with the dam body’s temperature changes exhibiting a certain lag compared to the ambient temperature. The interior of the dam is under compression, while the upstream and downstream surfaces experience significant tensile stress. This project adopts targeted temperature control measures for the cold environmental conditions of the region, which are reasonably implemented and effectively reduce the temperature rise of the concrete during construction, achieving the temperature control objectives. This study also explores the impact of the cooling water pipe density on the dam body. The research results offer valuable references for the implementation of temperature control measures and the establishment of temperature control standards for concrete gravity dams in cold regions.

Authors

Institutions

Publication Details

Journal
Water
Published
2024-09-27
DOI
https://doi.org/10.3390/w16192761
Citations
6
Primary Topic
Dam Engineering and Safety
Type
article
Field-Weighted Citation Impact
1.57
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Feasibility Study of Temperature Control Measures during the Construction of Large-Volume Concrete Gravity Dams in Cold Regions: A Case Study

Penghai Yin, Anshuang Su, Shu Yu, Suizi Jia et al.
6 citations
Water
Dam Engineering and Safety
1.57
article

Feasibility Study of Temperature Control Measures during the Construction of Large-Volume Concrete Gravity Dams in Cold Regions: A Case Study

Penghai Yin, Anshuang Su, Shu Yu, Suizi Jia, Rongcai Guan, Ziyu Lv
article en
6 citations

Abstract

Effective temperature control measures are crucial for achieving temperature regulation and preventing cracking in the dam body during the construction of large-volume concrete gravity dams. Due to the low ambient temperatures in winter, it is especially important to focus on temperature control measures for concrete dam construction in cold regions. This paper employs a numerical simulation method that takes into account dam temperature control measures to simulate and predict the overall temperature and stress fields of the Guanmenzuizi Reservoir Dam, and validates these simulations with field monitoring results. This study finds that the ambient temperature significantly impacts the temperature and stress of the dam body’s concrete. The internal temperature of the dam reaches its highest value approximately 7 days after pouring, followed by periodic fluctuations, with the dam body’s temperature changes exhibiting a certain lag compared to the ambient temperature. The interior of the dam is under compression, while the upstream and downstream surfaces experience significant tensile stress. This project adopts targeted temperature control measures for the cold environmental conditions of the region, which are reasonably implemented and effectively reduce the temperature rise of the concrete during construction, achieving the temperature control objectives. This study also explores the impact of the cooling water pipe density on the dam body. The research results offer valuable references for the implementation of temperature control measures and the establishment of temperature control standards for concrete gravity dams in cold regions.

WaterVol. 16(19)
China University of Geosciences (Beijing) (CN), China Institute of Water Resources and Hydropower Research (CN), Heilongjiang Provincial Institute of Hydraulic Research (CN)
Openalex Percentile: Top 19%
Dam Engineering and Safety
1.57
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.