Bid Variability in Public–Private Partnerships: Lessons from Asset Monetization through the Toll-Operate-Transfer Model in India

Public–private partnerships are an important tool for infrastructure development, but variability in bids can undermine value for money. This study investigated bid variability in India’s initial two auction road assets under the Toll-Operate-Transfer (TOT) model. A comparative case study research design was utilized involving an in-depth analysis of the TOT I and TOT II auctions. Data was gathered from project reports, guidelines, news articles, stakeholder interviews, and then thematically analyzed. The analysis revealed substantial bid variability within and between the auctions. The findings showed bid variability within the auctions depended on the information gaps owing to the timing and quality of the information released by the auctioneer, the tender conditions and tender process, potential value enhancement and securitization of assets by the bidders, heterogeneous bidder objectives across asset types, and strategic bidding assumptions. The bid variability between the TOT I and TOT II auctions depended on asset quality, declared reserve price, sociopolitical factors, and the prevailing business conditions. While TOT I road quality and growth prospects encouraged strong bidding, overpricing, shifting business scenarios, and political uncertainty in TOT II states depressed bids below expectations. Results indicated that transparency around asset characteristics and traffic forecasts enables realistic bid assessments to control variability. It can inform bid rationalization and pricing mechanisms for future auctions of public infrastructure. Setting reserve prices reflecting project specifics also helped anchor bid ranges. Attracting larger bidder pools countered the influence of overly optimistic/pessimistic valuations. Gradual expansion into new geographies allowed adaptive policy learning.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2024-09-30
DOI
https://doi.org/10.1061/jcemd4.coeng-15231
Citations
1
Primary Topic
Public-Private Partnership Projects
Type
article
Field-Weighted Citation Impact
0.55
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Bid Variability in Public–Private Partnerships: Lessons from Asset Monetization through the Toll-Operate-Transfer Model in India

Ravi Shankar, Willie Tan
1 citations
Journal of Construction Engineering and Management
Public-Private Partnership Projects
0.55
article

Bid Variability in Public–Private Partnerships: Lessons from Asset Monetization through the Toll-Operate-Transfer Model in India

Ravi Shankar, Willie Tan
article en
1 citations

Abstract

Public–private partnerships are an important tool for infrastructure development, but variability in bids can undermine value for money. This study investigated bid variability in India’s initial two auction road assets under the Toll-Operate-Transfer (TOT) model. A comparative case study research design was utilized involving an in-depth analysis of the TOT I and TOT II auctions. Data was gathered from project reports, guidelines, news articles, stakeholder interviews, and then thematically analyzed. The analysis revealed substantial bid variability within and between the auctions. The findings showed bid variability within the auctions depended on the information gaps owing to the timing and quality of the information released by the auctioneer, the tender conditions and tender process, potential value enhancement and securitization of assets by the bidders, heterogeneous bidder objectives across asset types, and strategic bidding assumptions. The bid variability between the TOT I and TOT II auctions depended on asset quality, declared reserve price, sociopolitical factors, and the prevailing business conditions. While TOT I road quality and growth prospects encouraged strong bidding, overpricing, shifting business scenarios, and political uncertainty in TOT II states depressed bids below expectations. Results indicated that transparency around asset characteristics and traffic forecasts enables realistic bid assessments to control variability. It can inform bid rationalization and pricing mechanisms for future auctions of public infrastructure. Setting reserve prices reflecting project specifics also helped anchor bid ranges. Attracting larger bidder pools countered the influence of overly optimistic/pessimistic valuations. Gradual expansion into new geographies allowed adaptive policy learning.

Journal of Construction Engineering and ManagementVol. 150(12)
National University of Singapore (SG)
Partnerships for the goals
Openalex Percentile: Top 22%
Public-Private Partnership Projects
0.55
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.