A descriptive study of differential stuck pipe problem in Nahr Umr oil field: principles and treatments

Differential-pressure pipe sticking is one of the main problems that occurs during drilling operations, leading to an increase in the non-productive time (NPT). To address this problem, the industry uses a range of spotting fluids to enable the recovery of a differentially stuck pipe effectively. Thus, any delay in solving this problem can turn into a difficult rescue operation that can eventually lead to the abandonment of the well in extreme conditions. Therefore, it is crucial to choose the appropriate spotting fluid that is suitable for the specific mud composition, as using an unsuitable spotting fluid may result in dangerous conditions. Additionally, other factors can further complicate the process of freeing a stuck pipe. Therefore, for prevention, remediation, and enhancing the recovery of stuck pipes, it is important to understand the root causes of the pipe sticking issue, the conditions that lead to it, and the operational mechanisms of various spotted fluids and their application areas. This paper studies the challenges of pipe sticking during drilling operations, particularly emphasizing differential pipe sticking, and the role of spotting fluids in releasing pipe sticking. It discusses the testing and evaluation methods used to choose appropriate spotting fluids while rejecting the inferior options, highlighting the benefits and disadvantages. This study, which was conducted at Well NR-A in the Nahr Umr field in southeastern Iraq, aims to address the problem of differential stuck pipes. By employing a stuck pipe list check table, the mechanism of this problem was diagnosed, resulting in a thorough analysis of the causes of differential stuck pipe and subsequent steps necessary to release the stuck pipe. Finally, recommendations are presented to improve testing and evaluation methods, overcoming the limitations of conventional methods.

Authors

Institutions

Publication Details

Journal
Iraqi Journal of Chemical and Petroleum Engineering
Published
2024-09-30
DOI
https://doi.org/10.31699/ijcpe.2024.3.12
Primary Topic
Geotechnical Engineering and Underground Structures
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A descriptive study of differential stuck pipe problem in Nahr Umr oil field: principles and treatments

Karrar Talib Alhisnawy, Waleed M. Emtair, Ayad A. Alhaleem A. Alrazzaq
1 links
Iraqi Journal of Chemical and Petroleum Engineering
Geotechnical Engineering and Underground Structures
article

A descriptive study of differential stuck pipe problem in Nahr Umr oil field: principles and treatments

Karrar Talib Alhisnawy, Waleed M. Emtair, Ayad A. Alhaleem A. Alrazzaq
article en

Abstract

Differential-pressure pipe sticking is one of the main problems that occurs during drilling operations, leading to an increase in the non-productive time (NPT). To address this problem, the industry uses a range of spotting fluids to enable the recovery of a differentially stuck pipe effectively. Thus, any delay in solving this problem can turn into a difficult rescue operation that can eventually lead to the abandonment of the well in extreme conditions. Therefore, it is crucial to choose the appropriate spotting fluid that is suitable for the specific mud composition, as using an unsuitable spotting fluid may result in dangerous conditions. Additionally, other factors can further complicate the process of freeing a stuck pipe. Therefore, for prevention, remediation, and enhancing the recovery of stuck pipes, it is important to understand the root causes of the pipe sticking issue, the conditions that lead to it, and the operational mechanisms of various spotted fluids and their application areas. This paper studies the challenges of pipe sticking during drilling operations, particularly emphasizing differential pipe sticking, and the role of spotting fluids in releasing pipe sticking. It discusses the testing and evaluation methods used to choose appropriate spotting fluids while rejecting the inferior options, highlighting the benefits and disadvantages. This study, which was conducted at Well NR-A in the Nahr Umr field in southeastern Iraq, aims to address the problem of differential stuck pipes. By employing a stuck pipe list check table, the mechanism of this problem was diagnosed, resulting in a thorough analysis of the causes of differential stuck pipe and subsequent steps necessary to release the stuck pipe. Finally, recommendations are presented to improve testing and evaluation methods, overcoming the limitations of conventional methods.

Iraqi Journal of Chemical and Petroleum EngineeringVol. 25(3)
University of Basrah (IQ), University of Baghdad (IQ), NOF Corporation (Japan) (JP)
Openalex Percentile: Top 81%
Geotechnical Engineering and Underground Structures
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.