Preemptive Software Project Scheduling Considering Personality Traits

The success of software projects is inseparable from the effective scheduling of multi-skilled human resources. In software development, employees’ personality traits often affect the performance of their work. Additionally, software developers are usually multi-tasking, which makes software development tasks preemptive. In view of this, we investigate the preemptive software project scheduling problem considering personality traits (PSPSP-PT), which aims at assigning employees with different skills and personality traits to suitable tasks and determining the start time of each task with the consideration of preemption, multi-skill, and precedence relations such that the total cost of the project is minimized. We formulate a mixed-integer linear programming model for the PSPSP-PT and design a dual priority rules-based heuristic (DPRH). Based on a benchmark dataset that is generated using a full factorial design, computational experiments are conducted to analyze the performance of our DPRH. Comparative analysis with existing algorithms reveals that our DPRH is competitive in terms of efficiency and effectiveness.

Authors

Institutions

Publication Details

Journal
Systems
Published
2024-09-30
DOI
https://doi.org/10.3390/systems12100407
Primary Topic
Software Engineering Techniques and Practices
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Preemptive Software Project Scheduling Considering Personality Traits

Yuechen Wang, Hongbo Li, Qianrong Hui
Systems
Software Engineering Techniques and Practices
article

Preemptive Software Project Scheduling Considering Personality Traits

Yuechen Wang, Hongbo Li, Qianrong Hui
article en

Abstract

The success of software projects is inseparable from the effective scheduling of multi-skilled human resources. In software development, employees’ personality traits often affect the performance of their work. Additionally, software developers are usually multi-tasking, which makes software development tasks preemptive. In view of this, we investigate the preemptive software project scheduling problem considering personality traits (PSPSP-PT), which aims at assigning employees with different skills and personality traits to suitable tasks and determining the start time of each task with the consideration of preemption, multi-skill, and precedence relations such that the total cost of the project is minimized. We formulate a mixed-integer linear programming model for the PSPSP-PT and design a dual priority rules-based heuristic (DPRH). Based on a benchmark dataset that is generated using a full factorial design, computational experiments are conducted to analyze the performance of our DPRH. Comparative analysis with existing algorithms reveals that our DPRH is competitive in terms of efficiency and effectiveness.

SystemsVol. 12(10)
Shanghai University (CN)
Openalex Percentile: Top 74%
Software Engineering Techniques and Practices
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.