Enhancing Reliability of Construction Contingency Estimation at the Scoping Phase through Historical Cost Data Analysis

Accurate estimates of construction contingency, a vital element that accounts for unforeseen additional expenses during building, are crucial for construction project agencies. In the initial planning phase, with project specifics still under development, the top-down method is a popular approach for estimating contingency. This method employs a straightforward approach to calculating contingency, using a fixed percentage or a sliding scale based on project variables. While such a method offers simplicity, it suffers from constraints, notably the absence of rigorous evaluation and the challenges of considering project-specific risks. Hence, this research conducts a comprehensive analysis of historical highway project cost performance data to refine the applicability of the sliding scale methodologies and strengthen current top-down approaches. Using various statistical methods, the study creates probability distribution curves that show the likelihood of different contingency costs occurring, along with their associated confidence levels. These probability distribution curves provide cost estimators and project managers with a reliable way to improve the accuracy of early cost estimates during critical planning phases. This study will benefit project agencies by providing a more accurate and informed approach to budgeting and contingency management, thereby improving project cost reliability.

Authors

Institutions

Publication Details

Journal
ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems Part A Civil Engineering
Published
2024-09-30
DOI
https://doi.org/10.1061/ajrua6.rueng-1260
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Enhancing Reliability of Construction Contingency Estimation at the Scoping Phase through Historical Cost Data Analysis

H. David Jeong, Taewoo Ko, Kunhee Choi, Chau Le
ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems Part A Civil Engineering
BIM and Construction Integration
article

Enhancing Reliability of Construction Contingency Estimation at the Scoping Phase through Historical Cost Data Analysis

H. David Jeong, Taewoo Ko, Kunhee Choi, Chau Le
article en

Abstract

Accurate estimates of construction contingency, a vital element that accounts for unforeseen additional expenses during building, are crucial for construction project agencies. In the initial planning phase, with project specifics still under development, the top-down method is a popular approach for estimating contingency. This method employs a straightforward approach to calculating contingency, using a fixed percentage or a sliding scale based on project variables. While such a method offers simplicity, it suffers from constraints, notably the absence of rigorous evaluation and the challenges of considering project-specific risks. Hence, this research conducts a comprehensive analysis of historical highway project cost performance data to refine the applicability of the sliding scale methodologies and strengthen current top-down approaches. Using various statistical methods, the study creates probability distribution curves that show the likelihood of different contingency costs occurring, along with their associated confidence levels. These probability distribution curves provide cost estimators and project managers with a reliable way to improve the accuracy of early cost estimates during critical planning phases. This study will benefit project agencies by providing a more accurate and informed approach to budgeting and contingency management, thereby improving project cost reliability.

ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems Part A Civil EngineeringVol. 10(4)
University of North Carolina at Charlotte (US), East Texas A&M University (US), Texas A&M University (US)
Openalex Percentile: Top 83%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Enhancing Reliability of Construction Contingency Estimation at the Scoping Phase through Historical Cost Data Analysis — H. David Jeong, Taewoo Ko, et al. · ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems Part A Civil Engineering (2024) | TGRS Research Map | TGRS