Sand Production Prediction and Management Using a One-Dimensional Geomechanical Model: A Case Study in NahrUmr Formation, Subba Oil Field

Sand production in sandstone reservoirs is a complex problem for oil and gas companies. This problem can damage downhole equipment and surface production facilities. This paper presents a sand production case and quantifies sand risks for the NahrUmr formation located in Subbaoilfied.The risk of sanding or rock failure is commonly observed during production phases as well as drilling operations. A (1D) mechanical earth model was created using wireline log data and core data for estimating the formations mechanical properties.The extrapolation method is utilized for vertical stress prediction, whereas pore pressure and static Young’s modulus were calculated using Slowness Eaton method and John Fuller correlation respectively. The poro-elastic model was used to determine horizontal principal stresses and hydrocarbon intervals susceptible to sand production issues.The purpose of this study was achieved using Tech-Log software. Sand onset intervals are firstly predicted as an open hole using ten methods: Loading factor (LF), Critical drawdown pressure (CDDP), B-index, schlumberger (Sc), Elastic combination index (Ec-index), Interval Transit-Time (DTc), Total porosity method (PHIT), unconfined compressive strength (UCS), Shear modulus to bulk compressibility ratio (G/Cb), and shear failure method. Approximately ten methods refer to the same intervals that can produce sand. Secondly, sand depths were predicted by representing the well according to what actually existed as a cased hole by calculating the critical drawdown pressure (CDDP), which is calculated at various depletion rates (0%, 15%, 25%, and 35%) in order to measure the effect of reservoir pressure depletion on sand production. The results show that as the rock strength is increased, the amount of sand-free drawdown and depletion becomes larger. Also, a single-depth analysis was conducted for problem intervals, indicatg a sandwillproducefromdepth of 2527.7 m under certain conditions. Therefore, it is necessary to install sand control equipment in this well.

Authors

Institutions

Publication Details

Journal
Iraqi Geological Journal
Published
2024-09-30
DOI
https://doi.org/10.46717/igj.57.2c.6ms-2024-9-14
Citations
4
Primary Topic
Hydraulic Fracturing and Reservoir Analysis
Type
article
Field-Weighted Citation Impact
0.85

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Sand Production Prediction and Management Using a One-Dimensional Geomechanical Model: A Case Study in NahrUmr Formation, Subba Oil Field

Dhifaf Sadeq, A. M. Ayal
4 citations
Iraqi Geological Journal
Hydraulic Fracturing and Reservoir Analysis
0.85
article

Sand Production Prediction and Management Using a One-Dimensional Geomechanical Model: A Case Study in NahrUmr Formation, Subba Oil Field

Dhifaf Sadeq, A. M. Ayal
article en
4 citations

Abstract

Sand production in sandstone reservoirs is a complex problem for oil and gas companies. This problem can damage downhole equipment and surface production facilities. This paper presents a sand production case and quantifies sand risks for the NahrUmr formation located in Subbaoilfied.The risk of sanding or rock failure is commonly observed during production phases as well as drilling operations. A (1D) mechanical earth model was created using wireline log data and core data for estimating the formations mechanical properties.The extrapolation method is utilized for vertical stress prediction, whereas pore pressure and static Young’s modulus were calculated using Slowness Eaton method and John Fuller correlation respectively. The poro-elastic model was used to determine horizontal principal stresses and hydrocarbon intervals susceptible to sand production issues.The purpose of this study was achieved using Tech-Log software. Sand onset intervals are firstly predicted as an open hole using ten methods: Loading factor (LF), Critical drawdown pressure (CDDP), B-index, schlumberger (Sc), Elastic combination index (Ec-index), Interval Transit-Time (DTc), Total porosity method (PHIT), unconfined compressive strength (UCS), Shear modulus to bulk compressibility ratio (G/Cb), and shear failure method. Approximately ten methods refer to the same intervals that can produce sand. Secondly, sand depths were predicted by representing the well according to what actually existed as a cased hole by calculating the critical drawdown pressure (CDDP), which is calculated at various depletion rates (0%, 15%, 25%, and 35%) in order to measure the effect of reservoir pressure depletion on sand production. The results show that as the rock strength is increased, the amount of sand-free drawdown and depletion becomes larger. Also, a single-depth analysis was conducted for problem intervals, indicatg a sandwillproducefromdepth of 2527.7 m under certain conditions. Therefore, it is necessary to install sand control equipment in this well.

Iraqi Geological Journal
University of Baghdad (IQ)
University of Baghdad
Openalex Percentile: Top 30%
Hydraulic Fracturing and Reservoir Analysis
0.85
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.