An Integrated Solution in Utilizing Active Magnetic Ranging to Seal Off Underground Gas Storage: Theoretical Analysis and Field Test

Summary In this paper, we describe a comprehensive technology based on an active magnetic ranging system (AMR) for sealing off the cement plug (CP) in the open hole (OH) section of the wellbore below the existing CP for underground gas storage. Utilizing depleted oil and gas reservoirs for natural gas storage is an important approach toward achieving carbon neutrality. Sealing off old wellbores is prioritized according to relevant standards. The challenge with OHs with CP is that there are no magnetic beacons in the wellbore, and the extent of compaction is unknown. Accurate placement of the seal-off CP is crucial because current technical methods, such as electromagnetic and acoustic waves, have limitations. Magnetic ranging technology, which is mature and widely used for wellbore interceptions or collision avoidance, requires magnetic beacons such as steel casing, drillpipes, or bottomhole assemblies left in the borehole. On the other hand, acoustic positioning techniques are applicable but presently complex to run operationally. In this paper, we propose a comprehensive control technology. It starts by measuring the positional relationship between the subject wellbore (SW) and a magnetic beacon wellbore (MBW) using AMR. The data are then used in combination with additional skew data along with associate positional uncertainty or ellipse of uncertainty (EOU) to determine the location of the target wellbore (TW) and the MBW. By calculating the relative positional relationship between the SW and the TW, OH reentry below CP can be achieved within the EOU below the sidetracking point. After reentry, specific work such as crushing, element logging, caliper logging, and full hydrocarbon gas detection is performed to verify if the TW is still in the original position and if the caprock is properly squeezed and sealed off. The comprehensive technique or method was tested on five wells in the Bohai Bay, successfully assessing the position of the OH wellbore and reentering below the CP. The process system expands the field of AMR and demonstrates significant industrial application value. It provides a new means of sealing off complex old wells.

Authors

Institutions

Publication Details

Journal
SPE Journal
Published
2024-09-30
DOI
https://doi.org/10.2118/218685-pa
Citations
1
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.34
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An Integrated Solution in Utilizing Active Magnetic Ranging to Seal Off Underground Gas Storage: Theoretical Analysis and Field Test

Tian'en Liu, Lei Qiao, Guangjie Yuan, Ming Fang et al.
1 citations
SPE Journal
Drilling and Well Engineering
0.34
article

An Integrated Solution in Utilizing Active Magnetic Ranging to Seal Off Underground Gas Storage: Theoretical Analysis and Field Test

Tian'en Liu, Lei Qiao, Guangjie Yuan, Ming Fang, Yang Che, Ai He
article en
1 citations

Abstract

Summary In this paper, we describe a comprehensive technology based on an active magnetic ranging system (AMR) for sealing off the cement plug (CP) in the open hole (OH) section of the wellbore below the existing CP for underground gas storage. Utilizing depleted oil and gas reservoirs for natural gas storage is an important approach toward achieving carbon neutrality. Sealing off old wellbores is prioritized according to relevant standards. The challenge with OHs with CP is that there are no magnetic beacons in the wellbore, and the extent of compaction is unknown. Accurate placement of the seal-off CP is crucial because current technical methods, such as electromagnetic and acoustic waves, have limitations. Magnetic ranging technology, which is mature and widely used for wellbore interceptions or collision avoidance, requires magnetic beacons such as steel casing, drillpipes, or bottomhole assemblies left in the borehole. On the other hand, acoustic positioning techniques are applicable but presently complex to run operationally. In this paper, we propose a comprehensive control technology. It starts by measuring the positional relationship between the subject wellbore (SW) and a magnetic beacon wellbore (MBW) using AMR. The data are then used in combination with additional skew data along with associate positional uncertainty or ellipse of uncertainty (EOU) to determine the location of the target wellbore (TW) and the MBW. By calculating the relative positional relationship between the SW and the TW, OH reentry below CP can be achieved within the EOU below the sidetracking point. After reentry, specific work such as crushing, element logging, caliper logging, and full hydrocarbon gas detection is performed to verify if the TW is still in the original position and if the caprock is properly squeezed and sealed off. The comprehensive technique or method was tested on five wells in the Bohai Bay, successfully assessing the position of the OH wellbore and reentering below the CP. The process system expands the field of AMR and demonstrates significant industrial application value. It provides a new means of sealing off complex old wells.

SPE JournalVol. 29(11)
Tarim University (CN), China National Petroleum Corporation (China) (CN)
Openalex Percentile: Top 41%
Drilling and Well Engineering
0.34
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.