An Automatic Generation Method of Maintenance Worker Schedules at a Railroad Terminal Station by Tabu Search

Maintenance worker scheduling generates a daily schedule for each worker group to perform inspection and maintenance work such as cleaning rolling stock when superior trains turn around at a terminal station. Since the schedule varies from day to day according to changes in daily train timetables and rolling stock operations, it is required to be created for each day. This paper proposes a new method for automatic generation of maintenance worker schedules that can consider the priority of constraints by tabu search. It includes a new model and a generation method of an initial solution, and a generation method of neighborhood solutions. In order to confirm the effectiveness of the proposed method, we perform parameter sensitivity analysis of the tabu list. Moreover, we compare an actual schedule with schedules generated by the proposed method, a mathematical programming method that guarantees a theoretically optimal solution, and local search. The results indicate that the proposed method can generate a stable solution within a practical computation time of three minutes with reduced worker loads, regardless of the size of the train schedule.

Authors

Institutions

Publication Details

Journal
IEEJ Transactions on Industry Applications
Published
2024-09-30
DOI
https://doi.org/10.1541/ieejias.144.721
Citations
1
Primary Topic
Railway Systems and Energy Efficiency
Type
article
Field-Weighted Citation Impact
0.35
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An Automatic Generation Method of Maintenance Worker Schedules at a Railroad Terminal Station by Tabu Search

Satoshi Kato, Yoshikazu Fukuyama, Taichi Nakahigashi, Tatsuya Kokubo
1 citations
IEEJ Transactions on Industry Applications
Railway Systems and Energy Efficiency
0.35
article

An Automatic Generation Method of Maintenance Worker Schedules at a Railroad Terminal Station by Tabu Search

Satoshi Kato, Yoshikazu Fukuyama, Taichi Nakahigashi, Tatsuya Kokubo
article en
1 citations

Abstract

Maintenance worker scheduling generates a daily schedule for each worker group to perform inspection and maintenance work such as cleaning rolling stock when superior trains turn around at a terminal station. Since the schedule varies from day to day according to changes in daily train timetables and rolling stock operations, it is required to be created for each day. This paper proposes a new method for automatic generation of maintenance worker schedules that can consider the priority of constraints by tabu search. It includes a new model and a generation method of an initial solution, and a generation method of neighborhood solutions. In order to confirm the effectiveness of the proposed method, we perform parameter sensitivity analysis of the tabu list. Moreover, we compare an actual schedule with schedules generated by the proposed method, a mathematical programming method that guarantees a theoretically optimal solution, and local search. The results indicate that the proposed method can generate a stable solution within a practical computation time of three minutes with reduced worker loads, regardless of the size of the train schedule.

IEEJ Transactions on Industry ApplicationsVol. 144(10)
Railway Technical Research Institute (JP), Meiji University (JP)
Openalex Percentile: Top 36%
Railway Systems and Energy Efficiency
0.35
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.