DELAY RED FLAG CONSTRUCTION COMPANY: CONTROL ANALYSIS WITH FOUR LEVER OF CONTROL

Despite extensive research on construction delays, this persistent issue continues to challenge the global construction industry. This case study aims to enhance the theoretical and practical understanding of management control systems (MCS) in construction firms by identifying the primary causes of project delays and examining the MCS components involved. A qualitative case study was conducted at a national private construction company (Jakons) to identify delay factors and propose solutions by linking them to MCS. The study focused on two Jakons projects that experienced delays, with primary data collected through interviews with five key informants directly engaged in MCS for the projects. Analysis of the interviews revealed common delay causes related to the project owner, consultants, labor, and materials. These causes were then connected to MCS practices and assessed using the four Levers of Control (LoC) framework, including Belief, Boundary, Diagnostic, and Interactive control systems. The study identified areas for improvement in MCS related to communication management, coordination, competence, and risk management that impact schedule delays. These findings provide valuable guidance for construction practitioners in planning and managing projects and offer insights to reassess MCS strategies to mitigate delays and achieve timely project completion.

Authors

Institutions

Publication Details

Journal
Riset
Published
2024-09-27
DOI
https://doi.org/10.37641/riset.v6i2.2118
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

DELAY RED FLAG CONSTRUCTION COMPANY: CONTROL ANALYSIS WITH FOUR LEVER OF CONTROL

Jesica Handoko, Brigitta Notoatmodjo
Riset
BIM and Construction Integration
article

DELAY RED FLAG CONSTRUCTION COMPANY: CONTROL ANALYSIS WITH FOUR LEVER OF CONTROL

Jesica Handoko, Brigitta Notoatmodjo
article en

Abstract

Despite extensive research on construction delays, this persistent issue continues to challenge the global construction industry. This case study aims to enhance the theoretical and practical understanding of management control systems (MCS) in construction firms by identifying the primary causes of project delays and examining the MCS components involved. A qualitative case study was conducted at a national private construction company (Jakons) to identify delay factors and propose solutions by linking them to MCS. The study focused on two Jakons projects that experienced delays, with primary data collected through interviews with five key informants directly engaged in MCS for the projects. Analysis of the interviews revealed common delay causes related to the project owner, consultants, labor, and materials. These causes were then connected to MCS practices and assessed using the four Levers of Control (LoC) framework, including Belief, Boundary, Diagnostic, and Interactive control systems. The study identified areas for improvement in MCS related to communication management, coordination, competence, and risk management that impact schedule delays. These findings provide valuable guidance for construction practitioners in planning and managing projects and offer insights to reassess MCS strategies to mitigate delays and achieve timely project completion.

RisetVol. 6(2)
Universitas Katolik Widya Mandala Surabaya (ID)
Openalex Percentile: Top 83%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

DELAY RED FLAG CONSTRUCTION COMPANY: CONTROL ANALYSIS WITH FOUR LEVER OF CONTROL — Jesica Handoko, Brigitta Notoatmodjo · Riset (2024) | TGRS Research Map | TGRS