Construction Waste Transportation Planning under Uncertainty: Mathematical Models and Numerical Experiments

Annually, over 10 billion tons of construction and demolition waste is transported globally from sites to reception facilities. Optimal and effective planning of waste transportation holds the potential to mitigate cost and carbon emissions, and alleviate road congestion. A major challenge for developing an effective transportation plan is the uncertainty of the precise volume of waste at each site during the planning stage. However, the existing studies have assumed known demand in planning models but the assumption does not reflect real-world volatility. Taking advantage of the problem structure, this study adopts the stochastic programming methodology to approach the construction waste planning problem. An integer programming model is developed that adeptly addresses the uncertainty of the amount of waste in an elegant manner. The proposed stochastic programming model can efficiently handle practical scale problems. Our numerical experiments amass a comprehensive dataset comprising nearly 4300 records of the actual amount of construction waste generated in Hong Kong. The results demonstrate that incorporating demand uncertainty can reduce the transportation cost by 1% correlating with an increase in profit of 14% compared to those that do not consider the demand uncertainty.

Authors

Institutions

Publication Details

Journal
Mathematics
Published
2024-09-27
DOI
https://doi.org/10.3390/math12193018
Citations
1
Primary Topic
Facility Location and Emergency Management
Type
article
Field-Weighted Citation Impact
0.67
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Construction Waste Transportation Planning under Uncertainty: Mathematical Models and Numerical Experiments

Wen Yi, Huiwen Wang, Lu Zhen, Xin Zhou et al.
1 citations
Mathematics
Facility Location and Emergency Management
0.67
article

Construction Waste Transportation Planning under Uncertainty: Mathematical Models and Numerical Experiments

Wen Yi, Huiwen Wang, Lu Zhen, Xin Zhou, Ying Terk Lim
article en
1 citations

Abstract

Annually, over 10 billion tons of construction and demolition waste is transported globally from sites to reception facilities. Optimal and effective planning of waste transportation holds the potential to mitigate cost and carbon emissions, and alleviate road congestion. A major challenge for developing an effective transportation plan is the uncertainty of the precise volume of waste at each site during the planning stage. However, the existing studies have assumed known demand in planning models but the assumption does not reflect real-world volatility. Taking advantage of the problem structure, this study adopts the stochastic programming methodology to approach the construction waste planning problem. An integer programming model is developed that adeptly addresses the uncertainty of the amount of waste in an elegant manner. The proposed stochastic programming model can efficiently handle practical scale problems. Our numerical experiments amass a comprehensive dataset comprising nearly 4300 records of the actual amount of construction waste generated in Hong Kong. The results demonstrate that incorporating demand uncertainty can reduce the transportation cost by 1% correlating with an increase in profit of 14% compared to those that do not consider the demand uncertainty.

MathematicsVol. 12(19)
Shanghai University (CN), Hong Kong Polytechnic University (HK)
Industry, innovation and infrastructure
Openalex Percentile: Top 22%
Facility Location and Emergency Management
0.67
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Construction Waste Transportation Planning under Uncertainty: Mathematical Models and Numerical Experiments — Wen Yi, Huiwen Wang, et al. · Mathematics (2024) | TGRS Research Map | TGRS