Analyzing sedimentation patterns in the Naumure Multipurpose Project (NMP) reservoir using 1D HEC-RAS modeling

Naumure Multipurpose Project (NMP) featuring a 169 m high Concrete Face Rock Filled Dam (CFRD) is the proposed reservoir project in the West Rapti River with an installed capacity of 218.34 MW. Most of the rivers in Nepal carry significant sediment loads that will consequently catalyze reservoir sedimentation. This phenomenon prevails as the primary factor in reducing reservoirs useful life, making ineffective for both flood control and hydroelectricity generation. Ultimately, such process of sedimentation has adverse impacts on projects economic feasibility and long-term sustainability. Therefore, the objective of this research was to examine the expected sediment deposition pattern in the NMP reservoir throughout its operational period by employing 1D HEC-RAS model to simulate the sedimentation process. The model was simulated for 10, 20, 30, 40 and 50 years. Yang's equation as a sediment transport function, Active layer as a bed sorting method and Toffaleti as a fall velocity method were best suited for the river reach. The delta deposition was formed between 11 km and 22 km upstream of the dam region in the Jhimruk river, with the sediment deposition depth reaching peaks of about 23 m, 38 m, 39 m, 41 m and 49 m in 10, 20, 30, 40 and 50 years, respectively. Similarly, the delta deposition was formed between 13 km and 33 km upstream of dam region in the Madi river, with the sediment deposition depth reaching peaks of about 47 m, 62 m, 60 m, 68 m and 75 m in 10, 20, 30, 40 and 50 years respectively. Headcutting of delta deposition occurred between 20 and 30 year due to high flood during low stage of reservoir. Furthermore, the study revealed that about 6.22%, 11.61%, 15.94%, 22.96% and 25.65% of the storage capacity of NMP reservoir will be depleted in 10, 20, 30, 40 and 50 years respectively.

Authors

Institutions

Publication Details

Journal
Scientific Reports
Published
2024-09-27
DOI
https://doi.org/10.1038/s41598-024-73883-x
Citations
7
Primary Topic
Hydrology and Watershed Management Studies
Type
article
Field-Weighted Citation Impact
1.41
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analyzing sedimentation patterns in the Naumure Multipurpose Project (NMP) reservoir using 1D HEC-RAS modeling

Ram Krishna Regmi, Subash Chaudhary, Nabin Bhatt, Subash Kunwar et al.
7 citations
Scientific Reports
Hydrology and Watershed Management Studies
1.41
article

Analyzing sedimentation patterns in the Naumure Multipurpose Project (NMP) reservoir using 1D HEC-RAS modeling

Ram Krishna Regmi, Subash Chaudhary, Nabin Bhatt, Subash Kunwar, Saurab Gautam, Vishan Dahal, Shishir Bhandari
article en
7 citations

Abstract

Naumure Multipurpose Project (NMP) featuring a 169 m high Concrete Face Rock Filled Dam (CFRD) is the proposed reservoir project in the West Rapti River with an installed capacity of 218.34 MW. Most of the rivers in Nepal carry significant sediment loads that will consequently catalyze reservoir sedimentation. This phenomenon prevails as the primary factor in reducing reservoirs useful life, making ineffective for both flood control and hydroelectricity generation. Ultimately, such process of sedimentation has adverse impacts on projects economic feasibility and long-term sustainability. Therefore, the objective of this research was to examine the expected sediment deposition pattern in the NMP reservoir throughout its operational period by employing 1D HEC-RAS model to simulate the sedimentation process. The model was simulated for 10, 20, 30, 40 and 50 years. Yang's equation as a sediment transport function, Active layer as a bed sorting method and Toffaleti as a fall velocity method were best suited for the river reach. The delta deposition was formed between 11 km and 22 km upstream of the dam region in the Jhimruk river, with the sediment deposition depth reaching peaks of about 23 m, 38 m, 39 m, 41 m and 49 m in 10, 20, 30, 40 and 50 years, respectively. Similarly, the delta deposition was formed between 13 km and 33 km upstream of dam region in the Madi river, with the sediment deposition depth reaching peaks of about 47 m, 62 m, 60 m, 68 m and 75 m in 10, 20, 30, 40 and 50 years respectively. Headcutting of delta deposition occurred between 20 and 30 year due to high flood during low stage of reservoir. Furthermore, the study revealed that about 6.22%, 11.61%, 15.94%, 22.96% and 25.65% of the storage capacity of NMP reservoir will be depleted in 10, 20, 30, 40 and 50 years respectively.

Scientific ReportsVol. 14(1)
Tribhuvan University (NP), Institute of Engineering (NP)
Openalex Percentile: Top 20%
Hydrology and Watershed Management Studies
1.41
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.