Research on production line optimization based on NSGA-II algorithm
The scheduling problem of workshop production process is an important research object of intelligent manufacturing. In this paper, the idea of introducing reverse learning is integrated into NSGA-II algorithm, and an improved NSGA-Ⅱ algorithm based on reverse learning is proposed to solve the P-FJSP problem, which is easy to prematurely converge to the local optimal solution. It is especially suitable for the production scheduling problem of large quantities and batches, and it is also proved that the algorithm can be well applied to the production line scheduling system.
Authors
- Zheng Li (ORCID: https://orcid.org/0000-0002-6842-9052)
- Guohua Cao (ORCID: https://orcid.org/0000-0001-6297-0502)
- jingsong duan
- guoqing Ma
Institutions
- Changchun University of Science and Technology (CN)
- Harbin Institute of Technology (CN)
- Anhui Institute of Robotics Industrial Technology Research Institute (CN)
- Wuhu Hit Robot Technology Research Institute (CN)
Publication Details
- Published
- 2024-09-27
- DOI
- https://doi.org/10.1117/12.3050471
- Citations
- 1
- Primary Topic
- Assembly Line Balancing Optimization
- Type
- article
- Field-Weighted Citation Impact
- 0.35