A Rigorous Examination of Twelve Cutting-Edge Machine-Learning Techniques for Predicting Time and Cost in Tunneling Projects

This study aimed to investigate and analyze the performance of twelve machine learning (ML) algorithms in estimating the construction time and cost of drill and blast tunnels. Thirteen tunnels located in different regions of Iran were selected, resulting in 900 data sets. Ten parameters were identified as influential factors affecting the construction time and cost of these tunnels. 80% of the data set was used for training, while the remaining 20% was reserved for testing. Additionally, 288 unseen data sets were utilized for evaluation purposes. All the algorithms demonstrated accurate performance on the test data sets, with R-squared values exceeding 0.93. However, only the Gaussian process regression algorithm achieved satisfactory results on the unseen data sets. Furthermore, a graphical user interface (GUI) was developed based on the trained ML models. This GUI allows real-time estimation of the time and cost of drill and blast tunnels and can be updated during construction.

Authors

Institutions

Publication Details

Journal
Journal of Construction Engineering and Management
Published
2024-09-28
DOI
https://doi.org/10.1061/jcemd4.coeng-15070
Citations
9
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
2.35
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Rigorous Examination of Twelve Cutting-Edge Machine-Learning Techniques for Predicting Time and Cost in Tunneling Projects

Farhan A. Alenizi, Yahya Alassaf, Arsalan Mahmoodzadeh, Hawkar Hashim Ibrahim et al.
9 citations
Journal of Construction Engineering and Management
Tunneling and Rock Mechanics
2.35
article

A Rigorous Examination of Twelve Cutting-Edge Machine-Learning Techniques for Predicting Time and Cost in Tunneling Projects

Farhan A. Alenizi, Yahya Alassaf, Arsalan Mahmoodzadeh, Hawkar Hashim Ibrahim, Hamid Reza Nejati, Laith R. Flaih
article en
9 citations

Abstract

This study aimed to investigate and analyze the performance of twelve machine learning (ML) algorithms in estimating the construction time and cost of drill and blast tunnels. Thirteen tunnels located in different regions of Iran were selected, resulting in 900 data sets. Ten parameters were identified as influential factors affecting the construction time and cost of these tunnels. 80% of the data set was used for training, while the remaining 20% was reserved for testing. Additionally, 288 unseen data sets were utilized for evaluation purposes. All the algorithms demonstrated accurate performance on the test data sets, with R-squared values exceeding 0.93. However, only the Gaussian process regression algorithm achieved satisfactory results on the unseen data sets. Furthermore, a graphical user interface (GUI) was developed based on the trained ML models. This GUI allows real-time estimation of the time and cost of drill and blast tunnels and can be updated during construction.

Journal of Construction Engineering and ManagementVol. 150(12)
Northern Border University (SA), Cihan University-Erbil (IQ), Prince Sattam Bin Abdulaziz University (SA), Tarbiat Modares University (IR), Salahaddin University-Erbil (IQ)
Openalex Percentile: Top 12%
Tunneling and Rock Mechanics
2.35
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A Rigorous Examination of Twelve Cutting-Edge Machine-Learning Techniques for Predicting Time and Cost in Tunneling Projects — Farhan A. Alenizi, Yahya Alassaf, et al. · Journal of Construction Engineering and Management (2024) | TGRS Research Map | TGRS