Monitoring and control of steel truss arch bridge jacking construction

Through the real-time monitoring of the internal force, alignment and suspender force in the process of bridge jacking construction, the measured data and theoretical calculation values obtained from the monitoring are compared and analyzed, and it is found that the measured data are in good agreement with the theoretical calculation values. The results show that through the analysis of the real-time monitoring data of the jacking process of the bridge, the measured stress values of the main beam are within the range of –40.79 MPa ~25.13 MPa, and the measured stress of the main arch is within –40.33 MPa ~16.06 MPa, which does not exceed the allowable stress range of the steel in the jacking process, and the structure is safe. The measured elevation of the line is in good agreement with the theoretical elevation, and the deviation is mostly less than 5 mm, and the maximum deviation does not exceed the limit value of 8mm. The difference between the measured cable force and the designed cable force in the stage of removing the temporary pier is very small, which does not exceed ±5% and meets the requirements of the specification. The research in this paper can provide a reference for the jacking construction of similar bridges.

Authors

Institutions

Publication Details

Journal
Archives of Civil Engineering
Published
2024-09-27
DOI
https://doi.org/10.24425/ace.2024.150968
Primary Topic
Structural Engineering and Vibration Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Monitoring and control of steel truss arch bridge jacking construction

Xilong Zheng, Di Guan
Archives of Civil Engineering
Structural Engineering and Vibration Analysis
article

Monitoring and control of steel truss arch bridge jacking construction

Xilong Zheng, Di Guan
article en

Abstract

Through the real-time monitoring of the internal force, alignment and suspender force in the process of bridge jacking construction, the measured data and theoretical calculation values obtained from the monitoring are compared and analyzed, and it is found that the measured data are in good agreement with the theoretical calculation values. The results show that through the analysis of the real-time monitoring data of the jacking process of the bridge, the measured stress values of the main beam are within the range of –40.79 MPa ~25.13 MPa, and the measured stress of the main arch is within –40.33 MPa ~16.06 MPa, which does not exceed the allowable stress range of the steel in the jacking process, and the structure is safe. The measured elevation of the line is in good agreement with the theoretical elevation, and the deviation is mostly less than 5 mm, and the maximum deviation does not exceed the limit value of 8mm. The difference between the measured cable force and the designed cable force in the stage of removing the temporary pier is very small, which does not exceed ±5% and meets the requirements of the specification. The research in this paper can provide a reference for the jacking construction of similar bridges.

Archives of Civil Engineering
Harbin University (CN)
Sustainable cities and communities
Openalex Percentile: Top 81%
Structural Engineering and Vibration Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.