Study of bridge green construction technology and management based on ecological protection in the Yellow River basin

Based on the innovative approaches of “Typical Demonstration Project of Green Highway Construction of the Ministry of Transport” that carried out by the Anluo Highway Yellow River Bridge Project, this paper focuses on the construction process of the Yellow River Bridge in combination with the project characteristics which across the Yellow River Wetland Reserve. The project team implements the concept of “green highway”, takes “recycling, intensive conservation, and ecological protection” as the controlling point, and realizes the construction of highway bridges from the traditional high resource dependence mode to low consumption, low emission, low pollution, high efficiency, and other means by “technological innovation and management improvement”. The development and transformation of high efficiency and efficiency have achieved certain results, providing the valued reference for the following construction of green highway projects.

Authors

Institutions

Publication Details

Published
2024-09-26
DOI
https://doi.org/10.1117/12.3044823
Primary Topic
Regional Development and Environment
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Study of bridge green construction technology and management based on ecological protection in the Yellow River basin

Hongwei Wu, Jianli Wu, Jiang Liu, Guiyin Dong et al.
Regional Development and Environment
article

Study of bridge green construction technology and management based on ecological protection in the Yellow River basin

Hongwei Wu, Jianli Wu, Jiang Liu, Guiyin Dong, Jianhui Tang
article en

Abstract

Based on the innovative approaches of “Typical Demonstration Project of Green Highway Construction of the Ministry of Transport” that carried out by the Anluo Highway Yellow River Bridge Project, this paper focuses on the construction process of the Yellow River Bridge in combination with the project characteristics which across the Yellow River Wetland Reserve. The project team implements the concept of “green highway”, takes “recycling, intensive conservation, and ecological protection” as the controlling point, and realizes the construction of highway bridges from the traditional high resource dependence mode to low consumption, low emission, low pollution, high efficiency, and other means by “technological innovation and management improvement”. The development and transformation of high efficiency and efficiency have achieved certain results, providing the valued reference for the following construction of green highway projects.

CCCC Highway Consultants (China) (CN), Yellow River Institute of Hydraulic Research (CN)
Life in Land
Openalex Percentile: Top 74%
Regional Development and Environment
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Study of bridge green construction technology and management based on ecological protection in the Yellow River basin — Hongwei Wu, Jianli Wu, et al. · (2024) | TGRS Research Map | TGRS