Study of bridge green construction technology and management based on ecological protection in the Yellow River basin
Based on the innovative approaches of “Typical Demonstration Project of Green Highway Construction of the Ministry of Transport” that carried out by the Anluo Highway Yellow River Bridge Project, this paper focuses on the construction process of the Yellow River Bridge in combination with the project characteristics which across the Yellow River Wetland Reserve. The project team implements the concept of “green highway”, takes “recycling, intensive conservation, and ecological protection” as the controlling point, and realizes the construction of highway bridges from the traditional high resource dependence mode to low consumption, low emission, low pollution, high efficiency, and other means by “technological innovation and management improvement”. The development and transformation of high efficiency and efficiency have achieved certain results, providing the valued reference for the following construction of green highway projects.
Authors
- Hongwei Wu
- Jianli Wu (ORCID: https://orcid.org/0009-0007-1539-3053)
- Jiang Liu (ORCID: https://orcid.org/0000-0002-2836-7651)
- Guiyin Dong
- Jianhui Tang (ORCID: https://orcid.org/0000-0002-9006-263X)
Institutions
- CCCC Highway Consultants (China) (CN)
- Yellow River Institute of Hydraulic Research (CN)
Publication Details
- Published
- 2024-09-26
- DOI
- https://doi.org/10.1117/12.3044823
- Primary Topic
- Regional Development and Environment
- Type
- article
- Field-Weighted Citation Impact
- 0.00