Configuring Success: Unveiling Key Configurations for Enhanced Design Coordination in Hydropower Projects
Design coordination in hydropower projects is both complex and challenging due to their scale, environmental impact, or technological complexity. The current understanding of how to effectively enhance it is limited and often contradictory. This research explores five key conditions impacting design coordination: technical conditions, digital design capabilities, designers’ dynamic capabilities, partnering, and incentives. Utilizing fuzzy-set qualitative comparative analysis (fsQCA) on 28 large-scale hydropower project cases, this study identifies five distinct configurations that facilitate high-level design coordination, which can be grouped into three types: capability-centric, stakeholder-centric, and a hybrid approach combining both capability and stakeholder focus. The findings reveal that both high- and low-level design coordination outcomes can be achieved through various configurations of these conditions. This study advances the understanding of design coordination by adopting a configurational perspective and contributes to the literature on the adoption of emerging technologies and practices.
Authors
- Wenzhe Tang (ORCID: https://orcid.org/0000-0003-4419-7565)
- Colin Duffield (ORCID: https://orcid.org/0000-0001-6497-7759)
- Lihai Zhang (ORCID: https://orcid.org/0000-0002-1282-992X)
- Felix Kin Peng Hui (ORCID: https://orcid.org/0000-0002-4800-9130)
- Yang Liu (ORCID: https://orcid.org/0000-0003-1791-0134)
- Wenxin Shen (ORCID: https://orcid.org/0000-0002-2502-8590)
- Siyun Wang
Institutions
- The University of Melbourne (AU)
- Beijing Jiaotong University (CN)
- Australian Urban Research Infrastructure Network (AU)
- State Key Laboratory of Hydrology Water Resources and Hydraulic Engineering (CN)
- Tsinghua University (CN)
Publication Details
- Journal
- Journal of Construction Engineering and Management
- Published
- 2024-09-26
- DOI
- https://doi.org/10.1061/jcemd4.coeng-14830
- Citations
- 6
- Primary Topic
- Construction Project Management and Performance
- Type
- article
- Field-Weighted Citation Impact
- 2.94