Strains in sprayed concrete tunnel linings at Heathrow Terminal 4 and back-calculation of stress

This paper describes the installation and interpretation of strain gauges embedded in the sprayed concrete lining of the concourse tunnel at Heathrow Terminal 4 station, with readings taken over nearly 20 years. The rate of flow method was used to back-calculate stresses from the measured strains, which were then compared with the stresses obtained from pressure cells at the same locations. Interpretation of the pressure cell data and the pressure cell results have been published in earlier papers. The resulting 20-year history of stress and strain gives precious insights into the short- and long-term behaviour of a sprayed concrete lining. An increase in compressive strain up to 3 years followed by a slight decrease over the subsequent 15–16 years has been revealed. It is hypothesised that this is due to radial groundwater flow through the primary lining followed by the gradual application of hydrostatic water pressure to the waterproof membrane and secondary lining. The sprayed concrete primary lining was not designed for permanent loads but nevertheless appears to be supporting all of the effective stress, whereas the secondary lining is not supporting any ground loads but may be loaded by groundwater pressure.

Authors

Institutions

Publication Details

Journal
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering
Published
2024-09-23
DOI
https://doi.org/10.1680/jgeen.23.00213
Citations
1
Primary Topic
Geotechnical Engineering and Underground Structures
Type
article
Field-Weighted Citation Impact
0.26
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Strains in sprayed concrete tunnel linings at Heathrow Terminal 4 and back-calculation of stress

Benoît Jones, Charly Grand
1 citations
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering
Geotechnical Engineering and Underground Structures
0.26
article

Strains in sprayed concrete tunnel linings at Heathrow Terminal 4 and back-calculation of stress

Benoît Jones, Charly Grand
article en
1 citations

Abstract

This paper describes the installation and interpretation of strain gauges embedded in the sprayed concrete lining of the concourse tunnel at Heathrow Terminal 4 station, with readings taken over nearly 20 years. The rate of flow method was used to back-calculate stresses from the measured strains, which were then compared with the stresses obtained from pressure cells at the same locations. Interpretation of the pressure cell data and the pressure cell results have been published in earlier papers. The resulting 20-year history of stress and strain gives precious insights into the short- and long-term behaviour of a sprayed concrete lining. An increase in compressive strain up to 3 years followed by a slight decrease over the subsequent 15–16 years has been revealed. It is hypothesised that this is due to radial groundwater flow through the primary lining followed by the gradual application of hydrostatic water pressure to the waterproof membrane and secondary lining. The sprayed concrete primary lining was not designed for permanent loads but nevertheless appears to be supporting all of the effective stress, whereas the secondary lining is not supporting any ground loads but may be loaded by groundwater pressure.

Proceedings of the Institution of Civil Engineers - Geotechnical EngineeringVol. 178(3)
Coventry (United Kingdom) (GB), GEO Partner (Switzerland) (CH)
Openalex Percentile: Top 45%
Geotechnical Engineering and Underground Structures
0.26
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.