Design of Energy Storage System through Bus Energy Storage Cascade Analysis (BESCA)

Abstract This study improvised the Electricity System Cascading Analysis (ESCA) into the Bus Energy Storage Cascading Analysis (BESCA) then the method is applied in the electric bus transportation system. The BESCA applies pinch analysis methods to determine the minimum energy storage based on the current bus timetable and charging system. The increased charging load can also be moved to a non-operational period using BESCA. The minimum battery capacity can be determined more easily using the BESCA approach, the results of which are displayed graphically in the graph. The method was then used to study the effect of charger rate and the bus schedule on the electric bus battery capacity. The bus system’s application of BESCA shows that an electric bus with a minimum power requirement of 57.48 kWh and a 72 kW charging pole is needed.

Authors

Institutions

Publication Details

Journal
IOP Conference Series Earth and Environmental Science
Published
2024-09-01
DOI
https://doi.org/10.1088/1755-1315/1395/1/012025
Primary Topic
Advanced Battery Technologies Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Design of Energy Storage System through Bus Energy Storage Cascade Analysis (BESCA)

Lek Keng Lim, Haslenda Hashim, Zarina Ab Muis, Wai Shin Ho
IOP Conference Series Earth and Environmental Science
Advanced Battery Technologies Research
article

Design of Energy Storage System through Bus Energy Storage Cascade Analysis (BESCA)

Lek Keng Lim, Haslenda Hashim, Zarina Ab Muis, Wai Shin Ho
article en

Abstract

Abstract This study improvised the Electricity System Cascading Analysis (ESCA) into the Bus Energy Storage Cascading Analysis (BESCA) then the method is applied in the electric bus transportation system. The BESCA applies pinch analysis methods to determine the minimum energy storage based on the current bus timetable and charging system. The increased charging load can also be moved to a non-operational period using BESCA. The minimum battery capacity can be determined more easily using the BESCA approach, the results of which are displayed graphically in the graph. The method was then used to study the effect of charger rate and the bus schedule on the electric bus battery capacity. The bus system’s application of BESCA shows that an electric bus with a minimum power requirement of 57.48 kWh and a 72 kW charging pole is needed.

IOP Conference Series Earth and Environmental ScienceVol. 1395(1)
University of Technology Malaysia (MY)
Openalex Percentile: Top 68%
Advanced Battery Technologies Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.