Impact of client relationship on project delay: Moderating role of project governance

The projects of the IT industry are considered successful when they are completed within the timeline, budget, and client satisfaction on a specific project. Although client relationship is not given much importance in the delay of a project, through several studies it has been seen that the project is delayed in the IT industry due to a lack of awareness about the project to the client. The objective of this study is to inspect the impact of client relationships on project delay. Drawing on stakeholder theory and agency theory, this study investigates how client relationship influences project delay through project awareness and the role of project governance as moderator. A deductive approach of reasoning was used to test the hypotheses formulated under the current research work and proceed by using the quantitative method. This study employed a cross-sectional research design, where data was collected at a specific point in time through a survey strategy. Data was collected from the sample of 288 respondents from the IT companies of Rawalpindi and Islamabad. The data was collected using a convenience sampling technique. The demographics of the respondents were analyzed through the IBM-SPSS software program. The assumptions and the reliability of the model were also tested in SPSS. In this study, it was discovered that effective management of client relationships significantly reduces project delays, with project awareness being a crucial factor in this mitigation process. The results revealed that client relationship was negatively associated with project delay and project awareness. Whereas this linkage was mediated by project awareness. This study concludes that adequate project awareness and fruitful project governance reduce project delays and lead to positive client relationships.

Authors

Institutions

Publication Details

Journal
Journal of Infrastructure Policy and Development
Published
2024-09-23
DOI
https://doi.org/10.24294/jipd.v8i10.6397
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Impact of client relationship on project delay: Moderating role of project governance

Muhammad Faizan Khan, Syed Hussain Mustafa Gillani, Mansour Mrabet, Iqra Ayaz et al.
Journal of Infrastructure Policy and Development
Construction Project Management and Performance
article

Impact of client relationship on project delay: Moderating role of project governance

Muhammad Faizan Khan, Syed Hussain Mustafa Gillani, Mansour Mrabet, Iqra Ayaz, Muhammad Tanveer
article en

Abstract

The projects of the IT industry are considered successful when they are completed within the timeline, budget, and client satisfaction on a specific project. Although client relationship is not given much importance in the delay of a project, through several studies it has been seen that the project is delayed in the IT industry due to a lack of awareness about the project to the client. The objective of this study is to inspect the impact of client relationships on project delay. Drawing on stakeholder theory and agency theory, this study investigates how client relationship influences project delay through project awareness and the role of project governance as moderator. A deductive approach of reasoning was used to test the hypotheses formulated under the current research work and proceed by using the quantitative method. This study employed a cross-sectional research design, where data was collected at a specific point in time through a survey strategy. Data was collected from the sample of 288 respondents from the IT companies of Rawalpindi and Islamabad. The data was collected using a convenience sampling technique. The demographics of the respondents were analyzed through the IBM-SPSS software program. The assumptions and the reliability of the model were also tested in SPSS. In this study, it was discovered that effective management of client relationships significantly reduces project delays, with project awareness being a crucial factor in this mitigation process. The results revealed that client relationship was negatively associated with project delay and project awareness. Whereas this linkage was mediated by project awareness. This study concludes that adequate project awareness and fruitful project governance reduce project delays and lead to positive client relationships.

Journal of Infrastructure Policy and DevelopmentVol. 8(10)
COMSATS University Islamabad (PK), Imam Mohammad ibn Saud Islamic University (SA), Islamic University (BD), Kowsar Hospital (IR), Management Sciences (United States) (US), Kohsar University Murree
Openalex Percentile: Top 81%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.