Perancangan Tata Letak Fasilitas Perakitan Box Radio Panel dengan Menggunakan Metode Blocplan pada PT Mobilkom Telekomindo

In the manufacturing industry, designing efficient facility layouts is critical to increasing productivity, reducing costs, and improving quality. PT Mobilkom Telekomindo, which operates in the trunking and SCADA radio communications sector, is working on a radio panel box procurement project from PT Pelindo. This research aims to evaluate the existing layout which still has workstations that are far apart and design a new layout to reduce assembly time using the BLOCPLAN algorithm. The results show that the new layout reduces the material transfer distance from 293.5 meters to 169 meters (42.4% reduction), as well as reducing the material transfer time from 10 minutes 27 seconds to 6 minutes 3 seconds (58.02% reduction).

Authors

Institutions

Publication Details

Journal
Ranah Research Journal of Multidisciplinary Research and Development
Published
2024-09-05
DOI
https://doi.org/10.38035/rrj.v6i6.1114
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Perancangan Tata Letak Fasilitas Perakitan Box Radio Panel dengan Menggunakan Metode Blocplan pada PT Mobilkom Telekomindo

Endang Budiasih, Rafif Fadhlurrahman Umarella, Dida Diah Damayanti
Ranah Research Journal of Multidisciplinary Research and Development
Advanced Manufacturing and Logistics Optimization
article

Perancangan Tata Letak Fasilitas Perakitan Box Radio Panel dengan Menggunakan Metode Blocplan pada PT Mobilkom Telekomindo

Endang Budiasih, Rafif Fadhlurrahman Umarella, Dida Diah Damayanti
article en

Abstract

In the manufacturing industry, designing efficient facility layouts is critical to increasing productivity, reducing costs, and improving quality. PT Mobilkom Telekomindo, which operates in the trunking and SCADA radio communications sector, is working on a radio panel box procurement project from PT Pelindo. This research aims to evaluate the existing layout which still has workstations that are far apart and design a new layout to reduce assembly time using the BLOCPLAN algorithm. The results show that the new layout reduces the material transfer distance from 293.5 meters to 169 meters (42.4% reduction), as well as reducing the material transfer time from 10 minutes 27 seconds to 6 minutes 3 seconds (58.02% reduction).

Ranah Research Journal of Multidisciplinary Research and DevelopmentVol. 6(6)
Telkom University (ID)
Openalex Percentile: Top 78%
Advanced Manufacturing and Logistics Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.