Flexible Integrated Scheduling Considering Periodic Maintenance

Aiming at the problem of current flexible integrated scheduling, most of the current research shortens the total processing time of products and ignores the loss of the equipment in the processing, which affects the scheduling ability of the equipment; in this context, a flexible integrated scheduling algorithm considering periodic maintenance (FIS-PM) is proposed. The algorithm flexibly mobilizes the processing sequence of the selected processing equipment, and uniformly maintains all equipment at a certain time. First, the ISA-PM algorithm adopts the strategy combination of the layer priority, the short-time, and the equipment priority strategy to schedule the operations. Then, based on the forest firefighting model, the maintenance start point and duration of the equipment are determined by the relationship between the number of the processed operations and the number of the unprocessed operations and the loss of equipment during the maintenance. Finally, the dynamic adjustment strategy is adopted, which not only realizes the maintenance of the equipment, but also reduces the makespan of the products. The experimental results show that the proposed ISA-PM algorithm realizes the optimization effect of reducing the makespan of complex products, completing the maintenance, and improving the overall utilization rate of equipment systems.

Authors

Institutions

Publication Details

Journal
Electronics
Published
2024-09-20
DOI
https://doi.org/10.3390/electronics13183730
Citations
3
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
1.05

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Flexible Integrated Scheduling Considering Periodic Maintenance

Wei Zhou, Zhiqiang Xie, Ming Sun, Xueying Ding et al.
3 citations
Electronics
Scheduling and Optimization Algorithms
1.05
article

Flexible Integrated Scheduling Considering Periodic Maintenance

Wei Zhou, Zhiqiang Xie, Ming Sun, Xueying Ding, Zhenjiang Tan
article en
3 citations

Abstract

Aiming at the problem of current flexible integrated scheduling, most of the current research shortens the total processing time of products and ignores the loss of the equipment in the processing, which affects the scheduling ability of the equipment; in this context, a flexible integrated scheduling algorithm considering periodic maintenance (FIS-PM) is proposed. The algorithm flexibly mobilizes the processing sequence of the selected processing equipment, and uniformly maintains all equipment at a certain time. First, the ISA-PM algorithm adopts the strategy combination of the layer priority, the short-time, and the equipment priority strategy to schedule the operations. Then, based on the forest firefighting model, the maintenance start point and duration of the equipment are determined by the relationship between the number of the processed operations and the number of the unprocessed operations and the loss of equipment during the maintenance. Finally, the dynamic adjustment strategy is adopted, which not only realizes the maintenance of the equipment, but also reduces the makespan of the products. The experimental results show that the proposed ISA-PM algorithm realizes the optimization effect of reducing the makespan of complex products, completing the maintenance, and improving the overall utilization rate of equipment systems.

ElectronicsVol. 13(18)
Harbin University of Science and Technology (CN), Jilin Normal University (CN)
National Natural Science Foundation of China, Jilin Normal University, National Social Science Fund of China
Openalex Percentile: Top 20%
Scheduling and Optimization Algorithms
1.05
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Flexible Integrated Scheduling Considering Periodic Maintenance — Wei Zhou, Zhiqiang Xie, et al. · Electronics (2024) | TGRS Research Map | TGRS