Production Optimization through Operate by Priority: The Development and Deployment of Downtime Advisory System to Permian Wells

Abstract High-well-count Permian Basin (Permian) assets pose unique challenges in daily production operations. With hundreds of wells under the oversight of a single production engineer and a limited number of lease operators, it is very hard to accurately track a well's production uptime. In the Permian, large variances have been observed in day-to-day production volume (oil, water, gas) balances due to unrecorded downtime. Volume losses attributed to events such as liquid loading, gas lift underperformance, choking and offset frac'-hits are usually not reported. These challenges make it difficult to identify production optimization opportunities and to have confidence in allocated production datasets. This paper describes a downtime advisory system (DTAS) that utilizes data analytics and rule-based algorithms to automatically detect well production downtime. DTAS reports non-producing wells daily to the operation teams and populates a priority list with impacted volumes in order to facilitate investigation of production impacting events and ultimately achieve production uplift. DTAS has been deployed to more than 2,500 ExxonMobil operated wells in the Permian with recommendations on daily well production downtime. DTAS identified additional production loss that was previously unrecorded, which was translated into opportunities that helped improve production optimization and allocations. The automated system has saved field personnel significant time by reducing time-on-tools and facilitating root cause diagnosis. This has enabled production engineers to focus on production uplift and achieve operational efficiency by priority.

Authors

Institutions

Publication Details

Journal
SPE Annual Technical Conference and Exhibition
Published
2024-09-20
DOI
https://doi.org/10.2118/221082-ms
Citations
3
Primary Topic
Reservoir Engineering and Simulation Methods
Type
article
Field-Weighted Citation Impact
2.06
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Production Optimization through Operate by Priority: The Development and Deployment of Downtime Advisory System to Permian Wells

Emmanouil Karantinos, Tuan Thanh Phi, David Gast, Joshua Edward Kaus et al.
3 citations
SPE Annual Technical Conference and Exhibition
Reservoir Engineering and Simulation Methods
2.06
article

Production Optimization through Operate by Priority: The Development and Deployment of Downtime Advisory System to Permian Wells

Emmanouil Karantinos, Tuan Thanh Phi, David Gast, Joshua Edward Kaus, Yan Wang
article en
3 citations

Abstract

Abstract High-well-count Permian Basin (Permian) assets pose unique challenges in daily production operations. With hundreds of wells under the oversight of a single production engineer and a limited number of lease operators, it is very hard to accurately track a well's production uptime. In the Permian, large variances have been observed in day-to-day production volume (oil, water, gas) balances due to unrecorded downtime. Volume losses attributed to events such as liquid loading, gas lift underperformance, choking and offset frac'-hits are usually not reported. These challenges make it difficult to identify production optimization opportunities and to have confidence in allocated production datasets. This paper describes a downtime advisory system (DTAS) that utilizes data analytics and rule-based algorithms to automatically detect well production downtime. DTAS reports non-producing wells daily to the operation teams and populates a priority list with impacted volumes in order to facilitate investigation of production impacting events and ultimately achieve production uplift. DTAS has been deployed to more than 2,500 ExxonMobil operated wells in the Permian with recommendations on daily well production downtime. DTAS identified additional production loss that was previously unrecorded, which was translated into opportunities that helped improve production optimization and allocations. The automated system has saved field personnel significant time by reducing time-on-tools and facilitating root cause diagnosis. This has enabled production engineers to focus on production uplift and achieve operational efficiency by priority.

SPE Annual Technical Conference and Exhibition
ExxonMobil (United States) (US)
Openalex Percentile: Top 11%
Reservoir Engineering and Simulation Methods
2.06
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.