Reduce Costs by Improving Reliability and Extending Mean Time Between Failure MTBF in a Harsh Electric Submersible Pump-Lifted Field

Abstract This paper presents a case study that includes the steps taken to improve the reliability of the artificial lift systems in a field of application. It is shown through the increase in the mean time between failures (MTBF) from 489 to 1,000 days and the decrease in the failure index from 0.47 to 0.24 over 5 years of continuous work. An important challenge in the field of study was the high number of electric submersible pump (ESP) failures over 90 failures per year which caused losses over 500 Kbbl of oil per year and required around of 65 MMUSD to recover their production through workover activities. An integrated continuous improvement approach was applied by identifying the issues, proposing solutions and measuring results. After the implementation of all the actions mentioned in this document, the MTBF was duplicated, the failure index was reduced 51% for ESP, 25% reduction in ESP-related production losses; plus 40% reduction in workover jobs which saves 26 MMUSD each year. Another benefit is reducing about 900 Tons of CO2 emissions thanks to less usage of diesel for workover jobs. This document shows three sections which summarize: 1) The initial diagnostics, 2) Actions for improvement, and 3) Results. These three sections include four areas of focus: i) Data Management, ii) Culture and Organization, iii) Technology, and iv) Processes and KPI. At the end of the document the reader will find the conclusions which show how a proper diagnostic can direct focused actions like the creation of a performance dashboard together with an organizational culture towards continuous improvement, and the associated benefits once the process is fully implemented.

Authors

Publication Details

Journal
SPE Annual Technical Conference and Exhibition
Published
2024-09-20
DOI
https://doi.org/10.2118/220825-ms
Primary Topic
Oil and Gas Production Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Reduce Costs by Improving Reliability and Extending Mean Time Between Failure MTBF in a Harsh Electric Submersible Pump-Lifted Field

Reyes Carlos, E Luis, Estefi Batallas, Gallegos Johanna et al.
SPE Annual Technical Conference and Exhibition
Oil and Gas Production Techniques
article

Reduce Costs by Improving Reliability and Extending Mean Time Between Failure MTBF in a Harsh Electric Submersible Pump-Lifted Field

Reyes Carlos, E Luis, Estefi Batallas, Gallegos Johanna, Tagarot Gary, Andagoya Kevin, Correal Alvaro, Pancho Juan, Villalobos Jorge, Torres Richard
article en

Abstract

Abstract This paper presents a case study that includes the steps taken to improve the reliability of the artificial lift systems in a field of application. It is shown through the increase in the mean time between failures (MTBF) from 489 to 1,000 days and the decrease in the failure index from 0.47 to 0.24 over 5 years of continuous work. An important challenge in the field of study was the high number of electric submersible pump (ESP) failures over 90 failures per year which caused losses over 500 Kbbl of oil per year and required around of 65 MMUSD to recover their production through workover activities. An integrated continuous improvement approach was applied by identifying the issues, proposing solutions and measuring results. After the implementation of all the actions mentioned in this document, the MTBF was duplicated, the failure index was reduced 51% for ESP, 25% reduction in ESP-related production losses; plus 40% reduction in workover jobs which saves 26 MMUSD each year. Another benefit is reducing about 900 Tons of CO2 emissions thanks to less usage of diesel for workover jobs. This document shows three sections which summarize: 1) The initial diagnostics, 2) Actions for improvement, and 3) Results. These three sections include four areas of focus: i) Data Management, ii) Culture and Organization, iii) Technology, and iv) Processes and KPI. At the end of the document the reader will find the conclusions which show how a proper diagnostic can direct focused actions like the creation of a performance dashboard together with an organizational culture towards continuous improvement, and the associated benefits once the process is fully implemented.

SPE Annual Technical Conference and Exhibition
Openalex Percentile: Top 65%
Oil and Gas Production Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Reduce Costs by Improving Reliability and Extending Mean Time Between Failure MTBF in a Harsh Electric Submersible Pump-Lifted Field — Reyes Carlos, E Luis, et al. · SPE Annual Technical Conference and Exhibition (2024) | TGRS Research Map | TGRS