CCUS Well Integrity Success Using Fit-for-Purpose Cement Designs

Abstract Defining long-term zonal isolation requirements for any carbon capture underground storage (CCUS) project life cycle is important to support well integrity success. The utility and scope of an underground storage project helps guide the isolation requirements for the well construction phase emphasizing the well design and cementing. Within the domain of cementing, a basis of design approach holistically can evaluate the corrosive risks, isolation requirements, cement installation, and degree of integrity for the anticipated well utility or load cases. The manuscript highlights the results of a field deployed and validated cement design being able to withstand CO2 corrosive exposure helping to achieve zonal isolation for CCUS well construction while managing the anticipated load conditions to ensure wellbore integrity. Several case histories, a 6-month corrosive study performance analysis, and cement integrity modeling support the fit-for-purpose designs helping to deliver well integrity success.

Authors

Institutions

Publication Details

Journal
SPE Annual Technical Conference and Exhibition
Published
2024-09-20
DOI
https://doi.org/10.2118/220924-ms
Citations
2
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
1.37
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

CCUS Well Integrity Success Using Fit-for-Purpose Cement Designs

Abdullah Sowailem, Joe Shine, Urooj Qasmi, Z. Bechah
2 citations
SPE Annual Technical Conference and Exhibition
Drilling and Well Engineering
1.37
article

CCUS Well Integrity Success Using Fit-for-Purpose Cement Designs

Abdullah Sowailem, Joe Shine, Urooj Qasmi, Z. Bechah
article en
2 citations

Abstract

Abstract Defining long-term zonal isolation requirements for any carbon capture underground storage (CCUS) project life cycle is important to support well integrity success. The utility and scope of an underground storage project helps guide the isolation requirements for the well construction phase emphasizing the well design and cementing. Within the domain of cementing, a basis of design approach holistically can evaluate the corrosive risks, isolation requirements, cement installation, and degree of integrity for the anticipated well utility or load cases. The manuscript highlights the results of a field deployed and validated cement design being able to withstand CO2 corrosive exposure helping to achieve zonal isolation for CCUS well construction while managing the anticipated load conditions to ensure wellbore integrity. Several case histories, a 6-month corrosive study performance analysis, and cement integrity modeling support the fit-for-purpose designs helping to deliver well integrity success.

SPE Annual Technical Conference and Exhibition
Saudi Aramco (Saudi Arabia) (SA)
Openalex Percentile: Top 20%
Drilling and Well Engineering
1.37
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

CCUS Well Integrity Success Using Fit-for-Purpose Cement Designs — Abdullah Sowailem, Joe Shine, et al. · SPE Annual Technical Conference and Exhibition (2024) | TGRS Research Map | TGRS