Assessing heavy maintenance alternatives for floating offshore wind farms: Towing vs. onsite replacement strategies

This paper presents the first comparative study evaluating towing and onsite replacement strategies for heavy maintenance of floating offshore wind (FOW) turbines. The towing maintenance strategy is characterised by a Markov chain and implemented within a computationally-efficient operation and maintenance (O&M) model. This model includes all key phases of the towing strategy: transit-to-site, turbine disconnection, towing-to-port, component replacement, towing-to-site, turbine connection, and transit-to-port. Additionally, the paper provides the first spatial assessment of heavy maintenance for FOW turbines in the North Sea. Evaluation across the ScotWind area shows that onsite replacement can reduce turbine downtime, especially for quick heavy maintenance operations like blade and gearbox replacements. However, for longer operations, such as generator and pitch and hydraulic system replacements, onsite solutions are more effective than towing only when O&M vessels can operate in wave heights over 1.5 metres. Otherwise, a mixed heavy maintenance strategy is recommended, combining onsite replacements for blades and gearboxes with towing for generators and pitch and hydraulic systems. The average turbine availability reduction with the mixed strategy is 0.39%, followed by the fully towing strategy at 0.43%, and the fully onsite replacement strategy at 0.46%. • Comparison between towing and onsite replacement strategies for floating turbines. • Towing strategy represented through a Markov chain and integrated into O&M model. • Spatial assessment of heavy maintenance alternatives across ScotWind area. • Onsite strategy reduces downtime for blades and gearbox replacements. • Towing strategy reduces downtime for generator and pitch system replacements.

Authors

Institutions

Publication Details

Journal
Applied Energy
Published
2024-09-19
DOI
https://doi.org/10.1016/j.apenergy.2024.124437
Citations
11
Primary Topic
Structural Integrity and Reliability Analysis
Type
article
Field-Weighted Citation Impact
2.34

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Assessing heavy maintenance alternatives for floating offshore wind farms: Towing vs. onsite replacement strategies

Markel Peñalba, James Carrol, Hong Yue, Manu Centeno-Telleria et al.
11 citations
Applied Energy
Structural Integrity and Reliability Analysis
2.34
article

Assessing heavy maintenance alternatives for floating offshore wind farms: Towing vs. onsite replacement strategies

Markel Peñalba, James Carrol, Hong Yue, Manu Centeno-Telleria, Jose Ignacio Aizpurua
article en
11 citations

Abstract

This paper presents the first comparative study evaluating towing and onsite replacement strategies for heavy maintenance of floating offshore wind (FOW) turbines. The towing maintenance strategy is characterised by a Markov chain and implemented within a computationally-efficient operation and maintenance (O&M) model. This model includes all key phases of the towing strategy: transit-to-site, turbine disconnection, towing-to-port, component replacement, towing-to-site, turbine connection, and transit-to-port. Additionally, the paper provides the first spatial assessment of heavy maintenance for FOW turbines in the North Sea. Evaluation across the ScotWind area shows that onsite replacement can reduce turbine downtime, especially for quick heavy maintenance operations like blade and gearbox replacements. However, for longer operations, such as generator and pitch and hydraulic system replacements, onsite solutions are more effective than towing only when O&M vessels can operate in wave heights over 1.5 metres. Otherwise, a mixed heavy maintenance strategy is recommended, combining onsite replacements for blades and gearboxes with towing for generators and pitch and hydraulic systems. The average turbine availability reduction with the mixed strategy is 0.39%, followed by the fully towing strategy at 0.43%, and the fully onsite replacement strategy at 0.46%. • Comparison between towing and onsite replacement strategies for floating turbines. • Towing strategy represented through a Markov chain and integrated into O&M model. • Spatial assessment of heavy maintenance alternatives across ScotWind area. • Onsite strategy reduces downtime for blades and gearbox replacements. • Towing strategy reduces downtime for generator and pitch system replacements.

Applied EnergyVol. 377
Ikerbasque (ES), Mondragon Unibertsitatea (ES), University of the Basque Country (ES), University of Strathclyde (GB), Donostia International Physics Center (ES)
Ministerio de Ciencia, Innovación y Universidades, European Commission, Eusko Jaurlaritza, HORIZON EUROPE Framework Programme, Agencia Estatal de Investigación
Affordable and clean energy
Openalex Percentile: Top 12%
Structural Integrity and Reliability Analysis
2.34
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.