Economic evaluation of a wind and solar energy hybrid electric sightseeing boat in Laemsak, Krabi Province, Thailand

This research aims to analyze the economic evaluation of using hybrid wind and solar energy with a diesel-engine long-tail boat in the Laemsak tourism community, Krabi province, Thailand. It is a quantitative research study that collects and estimates the costs and expenses of developing hybrid wind turbine and solar panels with diesel-engine long-tail boat, including initial development costs, operational and maintenance costs, and depreciation costs, and also estimates the benefits of using the developed boat, such as revenue from boat services, fuel savings, and carbon offset savings. The economic feasibility is analyzed using the Cost-Benefit Analysis (CBA) method by calculating the Payback Period (PP), Net Present Value (NPV), Benefit Cost Ratio (BCR), and Internal Rate of Return (IRR), as well as analyzing the Sensitivity of some uncertain factors. The analysis of the project over a 10-year period indicates PP of approximately 3-4 years, positive NPV, BCR greater than 1.0, and IRR much higher than the Interest Rate. These figures demonstrate that the project is highly economically viable and suitable for investment.

Authors

Institutions

Publication Details

Journal
Edelweiss Applied Science and Technology
Published
2024-09-16
DOI
https://doi.org/10.55214/25768484.v8i5.1695
Primary Topic
Maritime Transport Emissions and Efficiency
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Economic evaluation of a wind and solar energy hybrid electric sightseeing boat in Laemsak, Krabi Province, Thailand

Montri Luengchavanon, Prachyakorn Chaiyakot, Chanrit Permzup
Edelweiss Applied Science and Technology
Maritime Transport Emissions and Efficiency
article

Economic evaluation of a wind and solar energy hybrid electric sightseeing boat in Laemsak, Krabi Province, Thailand

Montri Luengchavanon, Prachyakorn Chaiyakot, Chanrit Permzup
article en

Abstract

This research aims to analyze the economic evaluation of using hybrid wind and solar energy with a diesel-engine long-tail boat in the Laemsak tourism community, Krabi province, Thailand. It is a quantitative research study that collects and estimates the costs and expenses of developing hybrid wind turbine and solar panels with diesel-engine long-tail boat, including initial development costs, operational and maintenance costs, and depreciation costs, and also estimates the benefits of using the developed boat, such as revenue from boat services, fuel savings, and carbon offset savings. The economic feasibility is analyzed using the Cost-Benefit Analysis (CBA) method by calculating the Payback Period (PP), Net Present Value (NPV), Benefit Cost Ratio (BCR), and Internal Rate of Return (IRR), as well as analyzing the Sensitivity of some uncertain factors. The analysis of the project over a 10-year period indicates PP of approximately 3-4 years, positive NPV, BCR greater than 1.0, and IRR much higher than the Interest Rate. These figures demonstrate that the project is highly economically viable and suitable for investment.

Edelweiss Applied Science and TechnologyVol. 8(5)
Prince of Songkla University (TH)
Prince of Songkla University
Openalex Percentile: Top 86%
Maritime Transport Emissions and Efficiency
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.