Manajemen Risiko pada Pelaksanaan Pekerjaan Bendung Batang Pagian Kabupaten Dharmasraya

Risks in construction project work are events or occurrences that are uncertain but can have a positive or negative impact on the sustainability of a project. In this research, the author carried out an analysis of risks, impacts and risk responses caused by failure in the construction work of the Batang Pangian weir construction project. The aim is to identify potential risks and the impact of risks that occur in the implementation of the Batang Pagian weir project work, as well as to obtain risk responses that can be carried out. The research was conducted qualitatively through field surveys and interviews with respondents involved in the field. Next, a risk assessment was carried out referring to the Godfrey development method. Based on the results of research analysis, it was found that the flood disaster was the main trigger for failure in the implementation of construction work for the Batang Pangian Dam. The impact of the flood disaster resulted in the main irrigation canal being closed so that water flow became obstructed and had an impact on the agricultural sector. The risk responses carried out include creating alternative channels and conducting outreach to the community regarding this problem.

Authors

Institutions

Publication Details

Journal
Jurnal Talenta Sipil
Published
2024-08-11
DOI
https://doi.org/10.33087/talentasipil.v7i2.601
Primary Topic
Economic Growth and Fiscal Policies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Manajemen Risiko pada Pelaksanaan Pekerjaan Bendung Batang Pagian Kabupaten Dharmasraya

Zarfinal Zarfinal, Bahrul Anif, Junaidi Junaidi
Jurnal Talenta Sipil
Economic Growth and Fiscal Policies
article

Manajemen Risiko pada Pelaksanaan Pekerjaan Bendung Batang Pagian Kabupaten Dharmasraya

Zarfinal Zarfinal, Bahrul Anif, Junaidi Junaidi
article en

Abstract

Risks in construction project work are events or occurrences that are uncertain but can have a positive or negative impact on the sustainability of a project. In this research, the author carried out an analysis of risks, impacts and risk responses caused by failure in the construction work of the Batang Pangian weir construction project. The aim is to identify potential risks and the impact of risks that occur in the implementation of the Batang Pagian weir project work, as well as to obtain risk responses that can be carried out. The research was conducted qualitatively through field surveys and interviews with respondents involved in the field. Next, a risk assessment was carried out referring to the Godfrey development method. Based on the results of research analysis, it was found that the flood disaster was the main trigger for failure in the implementation of construction work for the Batang Pangian Dam. The impact of the flood disaster resulted in the main irrigation canal being closed so that water flow became obstructed and had an impact on the agricultural sector. The risk responses carried out include creating alternative channels and conducting outreach to the community regarding this problem.

Jurnal Talenta SipilVol. 7(2)
Universitas Bung Hatta (ID), Encana (Canada) (CA)
Openalex Percentile: Top 80%
Economic Growth and Fiscal Policies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Manajemen Risiko pada Pelaksanaan Pekerjaan Bendung Batang Pagian Kabupaten Dharmasraya — Zarfinal Zarfinal, Bahrul Anif, et al. · Jurnal Talenta Sipil (2024) | TGRS Research Map | TGRS